Commuters on El Paseo Road between Sandell Road and Lee Whisman Street will experience intermittent lane closures starting Tuesday, March 10, 2026, and lasting through Friday, March 13, 2026. A&J Boring will be placing underground utilities as part of a wire utility permit. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 2.
Street Updates
Intermittent Lane Closures – Telshor Blvd. | Mar. 3 – Mar. 6, 2026
Northbound commuters on Telshor Boulevard between Missouri Ave. and University Ave. will experience intermittent lane closures starting Tuesday, March 3, 2026, and continuing through Friday, March 6, 2026. H&H Underground will be placing underground utilities as part of a wire utility permit. Access to residences and businesses will be maintained during the project, and motorists are urged to follow all posted signs. The work will be on Roadrunner Transit route 2 but will not affect any bus stop locations. This work is being done in City Council District 2.
Shoulder Work – N. Jornada Rd. | Mar. 2 – Mar. 5, 2026
Las Cruces motorists will experience shoulder work on N. Jornada Road from Engler Road heading north to the City limits beginning Monday, March 2, 2026, and lasting for three days. H & H Underground will be installing underground infrastructure for Comcast. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Lane Closure – Hatfield Rd. | Mar. 2 – Approx. Mar. 16, 2026
Lane closures will begin on Hatfield Rd. from Moose Ct. to 500 feet west on Hatfield Rd. starting Monday, March 2, 2026, and are expected to continue for two weeks. City crews will be performing road construction at this location. Short-term road closures may occur, and Holliday Ln. will serve as a detour route. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs and prepare for possible delays. Roadrunner Transit routes will not be affected. This work is being done in City Council District 1. No other conflicting construction projects will be active in the area.
Shoulder Work – Morningstar Dr. | Feb. 27 – Mar. 6, 2026
As part of a wire utility permit, shoulder work will continue on Morning Star between Los Alamos and Poco Lomas Court beginning Friday, February 27, 2026, and lasting through Friday, March 6, 2026. Work hours will be 7 a.m. to 5 p.m., Monday through Friday, with evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This project is located in City Council District 6.
Road Work – Melendres St. | Mar. 4 – Mar. 13, 2026
Shoulder Work – Calle de Nubes | Feb. 27, 2026
Shoulder Work – Kensington Way | Feb. 24 – Feb. 26, 2026
Las Cruces motorists will experience shoulder work at the intersection of Ortega Road and Kensington Way, continuing north on Kensington Way up to 5071 Kensington Way. This work will begin on Tuesday, February 24, 2026, and last for three days. H & H Underground will be installing underground infrastructure for Comcast. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Shoulder Work – Farney Ln | Feb. 17 – Feb. 20, 2026
Commuters on Farney Lane between Espina St. and El Paseo Rd. will experience shoulder work starting Tuesday, February 17, 2026, and lasting through Friday, February 20, 2026. A&J Boring will be placing underground utilities as part of a wire utility permit. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Fiber Line Installations – February 13, 2026
Metronet/Vexus crews are continuing restoration work following the installation of underground fiber lines in neighborhoods across Las Cruces.
Today’s restoration work includes the following areas:
- Embassy Dr & Camelot Dr (underground – restoration)
- Valle Vista – Missouri Ave (underground – restoration)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Fiber Line Installations – February 12, 2026
Metronet/Vexus crews are continuing restoration work following the installation of underground fiber lines in neighborhoods across Las Cruces.
Today’s restoration work includes the following areas:
- Embassy Dr & Camelot Dr (underground – restoration)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Arizona Avenue Road Closure | Feb. 18 & 19, 2026
Arizona Avenue will have a road closure from Mesquite Street to Compo Street.
The closure will be in effect for the San Pedro St./Arizona Ave. intersection as well.
Closure will take place on Wednesday, February 18 and Thursday, February 19. The project is expected to be completed in two days. Arizona Ave. will be closed from 7 a.m. to 4 p.m. The parking lot on the southwest corner of Arizona Ave. & Mesquite St. will be closed during construction.
The City Road Construction crew will be doing street maintenance on the roadway.
Roadrunner Transit routes will not be affected.
Fiber Line Installations – Feb. 11, 2026
Metronet/Vexus crews are continuing restoration work following the installation of underground fiber lines in neighborhoods across Las Cruces.
Today’s restoration work includes the following areas:
- Valle Vista & Missouri Ave (underground – restoration)
- Embassy Dr & Camelot Dr (underground – restoration)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Shoulder Work on Various Streets
Road work will take place on University Avenue and Dripping Springs Rd. beginning Tuesday, February 10, 2026, and continuing through Wednesday, February 25, 2026. Shoulder work will occur along University Avenue between Jack Nicklaus Drive and Aggie Rodeo Drive, and along Dripping Springs Rd. between Aggie Rodeo Drive and Observatory Road, and between Observatory Road and Sonoma Ranch Blvd. H&H Underground will perform this work as part of a wire utility permit. Access to residences and businesses will be maintained, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 2.
Fiber Line Installation – February 9 & 10, 2026
Metronet/Vexus crews are continuing restoration work following the installation of underground fiber lines in neighborhoods across Las Cruces.
Today’s restoration work includes:
- Hoagland Rd & Camelot Dr (underground – restoration)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Intermittent Lane Closures – Northrise Dr. | Feb. 9 – Feb. 13, 2026
Road Closure – N. Melendres St. | Ongoing until mid-May 2026
Las Cruces motorists will continue to experience a road closure on N. Melendres St. between W. Hadley Ave. and W. Picacho Ave. The closure is expected to last until mid-May 2026, depending on weather conditions. Work hours are 7 a.m. to 5 p.m., Monday through Friday. A detour route will be provided, and motorists are asked to follow posted detour signage. A-Mountain Construction is working on Phase 2 of the N. Melendres St. Roadway Reconstruction Project, which includes installation of a garden wall at the park, pavement, curb and gutter, driveways, ADA ramps, sidewalks, street lighting, and utilities such as water, sewer, and gas. Roadrunner Transit routes will not be affected.
Fiber Line Installations – Feb. 6, 2026
Metronet/Vexus crews are continuing restoration work following the installation of underground fiber lines in neighborhoods across Las Cruces.
Today’s restoration work includes the following areas:
- Don Buck Dr & E Springs Rd (underground – restoration)
- Roadrunner Pkwy & Golf Club Rd (underground – restoration)
- Spitz St & El Camino Real (underground – restoration)
- Hoagland Rd & Camelot Dr (underground – restoration)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Fiber Line Installations – February 4, 2026
Metronet/Vexus crews are continuing to install underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Don Buck Dr & E Springs Rd (underground)
- Roadrunner Pkwy & Golf Club Rd (underground)
- Spitz St & El Camino Real (underground)
- Hoagland Rd & Camelot Dr (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Rinconada Boulevard Shoulder Work | Feb. 4 – 11, 2026
North bound commuters on Rinconada Blvd. (between Northrise Dr. and Avenida Carmen) will have shoulder work starting Wednesday, February 4, 2026, and lasting through Wednesday, February 11, 2026.
A and J Drilling will be installing underground utilities in the vicinity.
The work will be on Roadrunner Transit Route 3 but will not affect any bus stop locations. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
Shoulder Work on Various Streets | Feb. 5 – 20, 2026
Las Cruces Motorists will experience shoulder work on the following streets, Sonora Springs Blvd. along Don Buck Dr, Maddox loop, Kuehne Ln, Doug Rains St, Kailei Ln & E Springs Rd. This work will start on February 5th and is to be completed by February 20th.
SA Connects will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. Access to residences will be maintained during the construction.
Fiber Line Installations – February 3, 2026
-
Pacifico Court & Maddox Loop (underground)
-
Roadrunner Pkwy & Golf Club Rd (underground)
-
Don Buck Dr & E Springs Rd (underground)
-
Hoagland Rd & Camelot Dr (underground)
Visit metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Fiber Line Installations – February 2, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Maddox Loop (underground)
- Roadrunner Pkwy & Golf Club Rd (underground)
- E Lohman Ave & Sonoma Ranch Blvd (underground)
- Hoagland Rd & Camelot Dr (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Road Work – Terrace Dr. & University Ave | Feb. 2 – Feb. 13, 2026
Lane Closures – Roadrunner Pkwy. | Feb. 2, 2026
Shoulder Work – Winton Circle | Feb. 2 – Feb. 6, 2025
Lane Closure – Spitz Ave. | Feb. 2 – Feb. 6, 2026
Fiber Line Installations – January 30, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Maddox Loop (underground)
- Roadrunner Pkwy & Golf Club Rd (underground)
- E Lohman Ave & Sonoma Ranch Blvd (underground)
- Valle Vista & Missouri Ave (underground)
- Hoagland Rd & Camelot Dr (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Fiber Line Installations – January 29, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Maddox Loop (underground)
- Sonora Springs & Corona Del Loop (underground)
- E Lohman Ave & Sonoma Ranch Blvd (underground)
- Valle Vista & Missouri Ave (underground)
- Scenic Ridge Loop & Lookout Ridge Dr (underground)
- Hoagland Rd & Galvan Dr (underground)
- E Lohman Ave & Nacho Dr (splicing)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Fiber Line Installations – Jan. 28, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Maddox Loop (underground)
- Sonora Springs Blvd & Corona Del Campo Loop (underground)
- E Lohman Ave & Sonoma Ranch Blvd (underground)
- Valle Vista & Missouri Ave (underground)
- Scenic Ridge Loop & Lookout Ridge Dr (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Intermittent Lane Closures – Multiple Streets in the Arts & Cultural District | Jan. 28 – Feb. 27, 2026
Las Cruces motorists are advised that intermittent lane closures will occur on several streets in the Arts & Cultural District beginning Wednesday, January 28, 2026, and continuing through Friday, February 27, 2026. Streets impacted include N. Mesquite St., Pinon Ave., N. San Pedro St., E. Picacho Ave., and N. Tornillo St. Highland Enterprises Inc. will perform work as part of the City of Las Cruces Arts & Cultural District Improvements project. Detours and signage will be present to direct traffic around the work zone. Motorists wishing to avoid possible delays are encouraged to seek alternative routes. Roadrunner Transit routes will not be affected. This work is being done in City Council District 1.
Roadrunner Parkway Intermittent Lane Closures | Jan. 30 – Feb. 27, 2026
Roadrunner Parkway, between Golf Club to Mission Road, will be impacted by intermittent lane closure as part of a wire utility permit.
The lane closures will begin Friday January 30, 2026, and continue through approximately Friday February 27, 2026.
Crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes 3 and bus stops 6 and 7 will be affected.
Intermittent Lane Closure – Boutz Rd. | Jan. 28, 2026
Fiber Line Installations – January 27, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Maddox Loop(underground)
- Sonoma Springs Ave & Corona Del Campo Loop (underground)
- E Lohman Ave & Paseo De Oñate (underground)
- Valle Vista & Missouri Ave (underground)
- Scenic Ridge Loop & Lookout Ridge Dr (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Shoulder Work – Multiple Streets | Jan. 27 – Feb. 10, 2026
Las Cruces motorists will experience shoulder work on Sonora Springs Blvd. along Don Buck Dr., Maddox Loop, Pacifico Ct., Bink Pl., and Cheyenne Dr. This work will start Tuesday, January 27, 2026, and is expected to be completed by Tuesday, February 10, 2026. SA Connects will be installing underground infrastructure for Metronet Fiber as part of a utility permit. Access to residences will be maintained during construction, and motorists are urged to follow all posted signs. RoadRUNNER Transit routes and bus stops will not be affected. This work is being done in City Council District 6.
Fiber Line Installations – January 26, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Loop (underground)
- E Lohman Ave & Paseo De Oñate (underground)
- Valle Vista & Missouri Ave (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Lane Closure & Shoulder Work – S. Valley Dr. & Hickory Dr. | Jan. 23 – Jan. 30, 2026
Shoulder Work – Multiple Streets | Jan. 27 – Feb. 16, 2026
Las Cruces motorists will experience shoulder work on multiple streets in City Council District 6 starting Tuesday, January 27, 2026, and continuing through Monday, February 16, 2026.
Streets impacted include:
- Scenic Ridge Loop between Lookout Ridge West and Lookout Ridge East
- Heritage Ridge Dr between Scenic Ridge Loop and Lookout Ridge Dr
- Rolling Hills Ln between Harmony Ridge Ln and Suncrest Arc
- Suncrest Arc between Lookout Ridge Dr and Rolling Hills Ln
- Lookout Ridge Dr between Scenic Ridge Loop and Midnight Ridge Arc
- Midnight Ridge Arc between Lookout Ridge Dr and Harmony Ridge Ln
- Eclipse Ridge Ln between Harmony Ridge Ln and Lookout Ridge Dr
- Moonlight Ridge Dr between Lookout Ridge Dr and Harmony Ridge Ln
- Midnight Ridge Ct between Morning Star Dr and Midnight Ridge Dr
- Poco Lomas Ct between Morning Star Dr and end of road
- Escuela Ct between Poco Lomas Ct and end of road
- Monte Bello Dr between Morning Star Dr and end of road
This work is part of a wire utility permit for underground utility installation. Crews will work from 7 a.m. to 5 p.m., Monday through Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Fiber Line Installations – January 23, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Loop (underground)
- E Lohman Ave & Paseo De Oñate (underground)
- Valle Vista & Missouri Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Shoulder Work – Longbow Loop, Chante Ct., & Cheyenne Dr. | Extended through Feb. 4, 2026
Las Cruces motorists will continue to experience shoulder work on Longbow Loop, Chante Ct., and Cheyenne Dr. This work has been extended and is expected to be completed by Tuesday, February 4, 2026. SA Connects will be installing underground infrastructure for Metronet Fiber as part of a utility permit. Access to residences will be maintained during construction, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 6.
Fiber Line Installations – Jan. 22, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Cheyenne Dr & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Campo Loop (underground)
- Lohman Ave & Paseo De Oñate (underground)
- Valle Vista & Missouri Ave (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Lane Closures – Roadrunner Pkwy & E Lohman Ave | Jan. 23 – Jan. 30, 2026
Las Cruces motorists will experience lane closures from 111 Roadrunner Pkwy heading south to the intersection of E. Lohman Ave, continuing west on E. Lohman Ave up to 3961 E. Lohman Ave. The work will start Friday, January 23, 2026, and is expected to be completed by Thursday, January 30, 2026. A & J Boring will be installing underground infrastructure for CONTERRA Fiber as part of a utility permit. Access to businesses will be maintained during construction, and motorists are urged to follow all posted signs. This work will affect Roadrunner Transit route 2 stop 35 and route 3 stop 39. The project is in City Council District 3.
Shoulder Work – Locust St. | Jan. 23, 2026
Shoulder Work – La Senda Dr & Memorial Ct | Jan. 26 – 28, 2026
Commuters on La Senda Drive between Calle Salud and Terrace Drive, and Memorial Court between Don Roser Drive and Telshor Blvd., will experience shoulder work starting Monday, January 26, 2026, and lasting through Wednesday, January 28, 2026. SA Connects will be placing underground utilities as part of a wire utility permit. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 2.
Fiber Line Installations – January 21, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Campo Loop (underground)
- Corona Del Campo Loop & Campana Ct (underground)
- Valle Vista & Missouri Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | January 16, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Valle Vista & Missouri Ave (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Shoulder Work – Valle Vista | Ongoing through Jan. 23, 2026
Las Cruces motorists will experience shoulder work on Valle Vista between S. Telshor Blvd. and the cul-de-sac. The work is ongoing through Friday, January 23, 2026. ARE Telecommunications LLC will be installing uncompleted underground infrastructure for Metro Net Fiber as part of a utility permit, followed by maintenance repair work once the fiber installation is completed. Access to residences will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes will not be affected. This work is being done in City Council District 2.
Street Work Notice – Fiber Line Installations | January 15, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Valle Vista & Missouri Ave (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Missouri Avenue Lane Closure near Fire Station 4 |Jan 20-Feb 20, 2026
There will be a lane closure on the east bound lane of Missouri
From January 20th through February 20th one lane will be closed on the east bound lane of Missouri north of Fire Station 4 to accommodate work for the sewer line installation.
Access to businesses and residences will be maintained.
Intermittent Lane Closures – Rinconada Blvd | Jan. 16 – Jan. 23, 2026
Street Work Notice – Fiber Line Installations | Jan. 14, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Valle Vista & Missouri Ave (underground)
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | January 13, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & Long Bow Loop (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Valle Vista & Missouri Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Intermittent Lane Closures – Lohman Ave | Jan. 7 – Jan. 16, 2026
Eastbound commuters on Lohman Avenue between Telshor Blvd. and Foothills Rd. will experience intermittent lane closures starting Wednesday, January 7, 2026, and lasting through Friday, January 16, 2026, between the hours of 7:00 a.m. and 4:00 p.m. SA Connects will be installing underground utilities in the vicinity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Street Work Notice – Fiber Line Installations | January 8, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & N Roadrunner Pkwy (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Morning Star (underground)
- Thunderbird St & El Dorado Ct (underground)
- Lookout Ridge & Suncrest Arc (underground – pulling)
- Valle Vista & Missouri Ave (underground)
- Bentley Dr & Boxster Way (pulling/splicing)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | January 7, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & N Roadrunner Pkwy (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Monte Bello Dr & Escuela Ct (underground)
- Thunderbird St & El Dorado Ct (underground)
- Main St & Triviz Dr (underground – pulling)
- Valle Vista & S Telshor Blvd (underground)
- Mall Dr & S Telshor Blvd (underground)
- Bentley Dr & Boxster Way (splicing)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | January 6, 2026
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Calais Ave & N Roadrunner Pkwy (underground)
- Capistrano Ave & Corona Del Loop (underground)
- Lohman Ave & Telshor Blvd (underground)
- Monte Bello Dr & Escuela Ct (underground)
- Thunderbird St & El Dorado Ct (underground)
- Main St & Triviz Dr (underground – pulling)
- Valle Vista & S Telshor Blvd ( underground)
- Mall Dr & S Telshor Blvd (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Intermittent Lane Closures – Lohman Ave. | Jan. 7 – Jan. 16, 2026
Eastbound commuters on Lohman Avenue between Telshor Blvd. and Foothills Rd. will experience intermittent lane closures starting Wednesday, January 7, 2026, and lasting through Friday, January 16, 2026, between the hours of 7:00 a.m. and 4:00 p.m. SA Connects will be installing underground utilities in the vicinity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 3.
Street Work Notice – Fiber Line Installations | January 5, 2026
-
Calais Ave & N Roadrunner Pkwy (underground)
-
Capistrano Ave & Corona Del Loop (underground)
-
Lohman Ave & Telshor Blvd (underground)
-
Monte Bello Dr & Poco Lomas Ct (underground)
-
Pebble Beach Rd & Buena Vida Cir (underground / pulling)
Lane Shift – Triviz Dr. | Jan. 5 – Jan. 9, 2026
Commuters on southbound Triviz Drive between Fairfax Ave. and Mulberry Ave. will experience a lane shift beginning Monday, January 5, 2026, and lasting through Friday, January 9, 2026. Morrow Enterprises, Inc. will be completing roadway work on Triviz Drive. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 1.
Street Work Notice – Fiber Line Installations | December 30, 2025
Street Work Notice – December 30, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Mall Dr & E Idaho Ave (underground – restoration)
- Pine & Pebble Beach (underground)
- Main Street and Camino Del Rex (underground)
- Terrace and La Paloma(Aerial)
- Sonoma Ranch and Golf Club Dr.(underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Avenida de Mesilla/Valley Dr. Lane Closure | Dec 30 & 31, 2025
Avenida de Mesilla/Valley Dr. Lane Closure beginning Dec. 30, 2025
A lane closure will be in effect for Eastbound Avenida de Mesilla at Valley Dr. on Tues., Dec. 30, 2025. The project is expected to be completed in two days.
City Road Construction crews will be doing street maintenance at the intersection.
Roadrunner Transit routes will not be affected.
Calais Avenue and Other Streets Shoulder Work | Jan 5-30, 2026
Shoulder work will take place on Calais Ave., Carmel Ct., Cadiz Ct., Longbow Loop, Chante Ct., Cheyenne Dr. between Jan. 5 to 30,
2026. SA Connects will be installing underground infrastructure for Metronet Fiber as part of a
utility permit. The shoulder work will not affect Roadrunner Transit.
Shoulder Work – Missouri Ave. | Dec. 29, 2025 – Jan. 9, 2026
Las Cruces motorists will experience shoulder work on Missouri Ave. between 2700 Missouri Ave. and S. Telshor Blvd. starting Monday, December 29, 2025, through Friday, January 9, 2026. ARE Telecommunications will be installing underground infrastructure for Vexus Fiber as part of a utility permit. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes will not be affected. This work is being done in City Council District 2.
Water Outage – Calle del Sol | Dec. 22, 2025 9 AM – 1 PM
Residents and businesses on Calle del Sol from Avenida Blanco to Avenida de Mesilla will experience a water outage from 9:00 a.m. to 1:00 p.m. on Monday, December 22, 2025. The outage will allow Spartan Construction of NM, LLC to complete water line tie-ins as part of the Casa Linda Acres Reconstruction CIP. Adjacent areas may also be affected. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice at least 24 hours in advance. Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting until the water becomes clear before washing laundry. The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their home for five minutes. If the discoloration remains, call the City at 575-526-0500 for assistance. The TTY phone number is 575-541-2182. This work is being done in City Council District 6.
Street Work Notice – Fiber Line Installations | December 18, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Mall Dr & E Idaho Ave (underground – restoration)
- Portico Trl & Golf Club Rd (underground)
- Buena Vida Ct & S Telshor Blvd (underground)
- N Main St & Temple St (underground)
- La Melodia Dr & La Camelia Dr (underground)
- Hillrise Dr & Hillrise Crest (pulling/splicing)
- Foothills Rd & Roadrunner Pkwy (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | December 17, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Mall Dr & E Idaho Ave (underground – restoration)
- Portico Trl & Golf Club Rd (underground)
- Lookout Rdg & Roadrunner Pkwy (underground)
- Hillrise Dr & Hillrise Ct (underground)
- La Melodia Dr & La Camelia Dr (underground)
- Foothills Rd & Roadrunner Pkwy (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Telshor/Commerce Intersection Lane Closures|Dec. 18, 2025
The intersection of Telshor Boulevard and Commerce Drive will experience lane closures starting Thursday December 18, 2025. H&H Underground will be installing private communication conduits to Sams Club. The work is anticipated to take one day.
Avoid possible delays by seeking alternative routes. Roadrunner Transit Route 1, Stop 16 may be affected.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closures – Roadrunner Pkwy | Dec. 16 – Dec. 24, 2025
As part of a wire utility permit, Roadrunner Pkwy between East Springs and Morning Star Drive will be impacted by intermittent lane closures beginning Tuesday, December 16, 2025, through approximately Wednesday, December 24, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit Route 3 and bus stops 10, 29, and 30 will be affected. This project is located in City Council District 6.
Street Work Notice – Fiber Line Installations | December 16, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Mall Dr & E Idaho Ave (underground)
- Portico Trl & Golf Club Rd (underground)
- Lookout Rdg & Roadrunner Pkwy (underground)
- Hillrise Dr & Hillrise Ct (underground)
- La Melodia Dr & La Camelia Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | December 15, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Embassy Dr & Hoagland Rd (underground)
- Portico Trl & Golf Club Rd (underground)
- Majestic Rdg & Majestic Shadow Way (underground)
- View Dr & Fairway Dr (underground)
- La Melodia Dr & La Cameila Dr (underground)
- Mall Dr & E Idaho Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
Visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Street Work Notice – Fiber Line Installations | December 11, 2025
-
Missouri Ave & S Telshor Blvd (underground – restoration)
-
Cave Creek & Golf Club Rd (underground)
-
Roadrunner Pkwy & Gold Club Rd (underground)
-
Hillrise Dr & Candeleras St (underground)
-
Missouri Ave & Risner St (underground)
-
La Melodia Dr & La Cameila Dr (underground)
-
Fairway Dr & Fairway Cir (aerial & underground)
-
Mall Dr & E Idaho Ave (underground)
Street Work Notice – Fiber Line Installations | Dec. 10, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Embassy Dr & Camelot Dr (underground – restoration)
- Cave Creek & Golf Club Rd (underground)
- Roadrunner Pkwy & Gold Club Rd (underground)
- Hillrise Dr & Executive Hils (underground)
- Dyer St & Risner St (underground)
- La Melodia Dr & La Cameila Dr (underground)
- Fairway Dr & Fairway Cir (aerial & underground)
- Mall Dr & E Idaho Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Questions about Metronet construction?
If you’ve seen Metronet + T-Mobile Fiber crews working in your area and have questions, visit Metronet.com/TMoConstruction or call 877-386-3876 for details or to submit a ticket.
Water Outage – Avenida de Mesilla & Calle del Sol | Dec. 11, 2025
Lane Closure – Avenida de Mesilla | Dec. 10 & Dec. 11, 2025
Las Cruces motorists are advised that Avenida de Mesilla, from Roberts Drive to Calle Del Sol, will have a lane closure on Wednesday, December 10, 2025, and Thursday, December 11, 2025. Spartan Construction of NM, LLC will be completing utility and roadway work in this area. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and stops will not be affected. This work is being done in City Council District 4.
Lane Closure – Idaho Ave. | Dec. 9, 2025
Lane Closure – Espina St. | Dec. 8, 2025
There will be a partial lane closure on southbound Espina St. at University Ave. on Monday, December 8, 2025. The left-turn lane that feeds onto eastbound University Ave. will be closed for street maintenance being performed by City Road Construction crews. The project is expected to be completed in one day. Access to surrounding areas will be maintained, and Roadrunner Transit routes will not be affected. The City has verified that no conflicting public or private construction projects will take place in the immediate area during this time. This work is being done in City Council District 2.
Intermittent Lane Closures – Roadrunner Pkwy. | Dec. 4 – Dec. 19, 2025
As part of a wire utility permit, Roadrunner Pkwy between Golf Club Rd. and Camino Coyote will be impacted by intermittent lane closures beginning Thursday, December 4, 2025, through approximately Friday, December 19, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This project is located in City Council District 6.
Road Closure – Central Ave. | Dec. 4 – Dec. 23, 2025
A road closure will take place along Central Ave. between Mesa Grande Drive and Mesa Drive beginning Thursday, December 4, 2025, through Tuesday, December 23, 2025. Smith & Aguirre Construction will be performing the work as part of the Tierra Del Sol Subdivision. Access to surrounding areas will be maintained where possible, and motorists are urged to follow all posted signs. Roadrunner Transit routes will not be affected. This work is being done in City Council Districts 5 and 6.
Lane Closure – Avenida de Mesilla | Dec. 2 – Dec. 6, 2025
Las Cruces motorists are advised that Avenida de Mesilla, from Roberts Drive to Calle Del Sol, will have a lane closure beginning Tuesday, December 2, 2025. The closure is expected to last approximately four days. Spartan Construction of NM, LLC will be completing utility and roadway work in this area. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and transit stops will not be affected. This work is being done in City Council District 4.
Street Work Notice – Fiber Line Installations | December 2, 2025
-
Embassy Dr & Hoagland Rd (underground)
-
Cave Spring Trl & Warm Springs Ln (underground)
-
Calle Belleza & Camino Lindo (underground)
-
Executive Hills Rd & Executive Pl (underground)
-
Lookout Ridge Dr & Candleras St (underground – potholing)
-
Camino Coyote & Paseo De Dia (underground)
Lane Closure & Shoulder Work – Mall Dr. & Telshor Blvd. | Dec. 4 – Dec. 19, 2025
Las Cruces motorists will experience a right lane closure on S. Telshor Blvd. between Mall Dr. and Doral Ct., and shoulder work on Mall Dr. from S. Telshor Blvd. to E. Idaho Ave., beginning Thursday, December 4, 2025, through Friday, December 19, 2025. ARE Telecommunications LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit. Access to residences and businesses will be maintained throughout the project. The lane closure will affect Roadrunner Transit at bus stop 40. This work is being done in City Council District 3.
Intermittent Lane Closures – Sonoma Ranch Blvd. | Dec. 2 – Dec. 5, 2025
As part of a wire utility permit, Sonoma Ranch Blvd. between Camino Coyote and approximately 200 feet to the south will be impacted by intermittent lane closures beginning Tuesday, December 2, 2025, through Friday, December 5, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs. Roadrunner Transit Route 2 and nearby bus stops may be affected. This project is located in City Council District 6.
Street Work Notice – Fiber Line Installations | December 1, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Embassy Dr & Hoagland Rd (underground)
- Cave Spring Trl & Warm Springs Ln (underground)
- Calle Belleza & Camino Lindo (underground)
- Lookout Ridge Dr & Candleras St (underground – potholing)
- Camino Coyote & Paseo De Dia (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Lane Closure – Espina St. | Dec. 2, 2025
There will be a partial lane closure on southbound Espina St. at University Ave. on Tuesday, December 2, 2025. The right-turn lane that feeds onto westbound University Ave. will be closed for street maintenance being performed by City Road Construction crews. The project is expected to be completed in one day. Access to surrounding areas will be maintained, and Roadrunner Transit routes will not be affected. The City has verified that no conflicting public or private construction projects will take place in the immediate area during this time. This work is being done in City Council District 2.
Shoulder Work Closures – Multiple Streets | Dec. 2 – Dec. 19, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures will begin Tuesday December 2, 2025, through approximately Friday December 19, 2025.The street include:
· La Melodia West between La Camelia Drive to Paseo de Dia. This project is in City Council District 6.
· La Melodia East Loop between La Camelia Drive to La Camelia Drive. This project is in City Council District 6.
· La Camelia Drive between La Melodia Drive to Capistrano Ave. This project is in City Council District 6.
· Capistrano Ave. between East La Camelia Drive to end of pavement. This project is in City Council District 6.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes and bus stops will not be affected.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182
Intermittent Lane Closures – Golf Club Rd. | Dec. 4 – Dec. 19, 2025
As part of a wire utility permit, intermittent lane closures will take place on the following street beginning Thursday, December 4, through Friday, December 19, 2025:
- Golf Club Rd., between Sonoma Ranch Blvd. and Portico Trail
(Located in City Council District 6)
Work Schedule:
Crews will be active Monday through Friday, from 7 a.m. to 5 p.m.
No construction will occur during evenings or weekends to minimize disruption.
Important Notes:
- Access to all residences and businesses will be maintained throughout the project.
- Motorists are encouraged to follow all posted signs and drive with caution in the area.
- Roadrunner Transit Route 2 and nearby bus stops may experience temporary impacts.
Shoulder Work Closures – Multiple Streets | Dec. 1 – Dec. 19, 2025
As part of a wire utility permit, shoulder work closures will impact several streets beginning Monday, December 1, 2025, through approximately Friday, December 19, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends.
Streets affected include:
- Percha Creek Way between Cave Creek Manor and Mission Road
- Cave Creek Manor between Mission Road and Golf Club Road
- Bubbling Wells Court between Cave Creek Manor and the end of the cul-de-sac
- Dry Creek Place between Cave Creek Manor and the end of the cul-de-sac
- Roadrunner Pkwy between Golf Club Road and Camino Coyote.
All work is located in City Council District 6. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Intermittent Lane Closures – Broadmoor Dr. | Dec. 2, 2025
Commuters on Broadmoor Drive between Karen Drive and Ronna Avenue will experience intermittent lane closures on Tuesday, December 2, 2025. Cobb Fendley will be performing field measurements in the vicinity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 2.
Street Work Notice – Fiber Line Installations | November 26, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Embassy Dr & Hoagland Rd (underground)
- Cave Spring Trl & Warm Springs Ln (underground)
- Calle Belleza & Camino Lindo (underground)
- Lookout Ridge Dr & Candleras St (underground – potholing)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closure – Northrise Dr. | Dec. 2 – Dec. 3, 2025
Commuters on Northrise Drive between Rinconada Blvd. and approximately 1500 feet west of Rinconada Blvd. will experience intermittent lane closures on Tuesday, December 2, 2025, and Wednesday, December 3, 2025. H&H Underground will be placing underground utilities as part of a wire utility permit. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected. This work is being done in City Council District 6.
Street Work Notice – Fiber Line Installations | November 24, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Embassy Dr & Hoagland Rd (underground)
- Cave Spring Trl & Warm Springs Ln (underground)
- Calle Belleza & Camino Lindo (underground)
- Midnight Ridge Dr & Lookout Ridge Dr (underground)
- Las Placitas Rd & Mormon Dr (underground)
- Bella Sierra Dr & Sonoma Ranch Blvd (underground & aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Closure – Peachtree Hills | Nov. 24, 2025 (Approx. 3 days)
Las Cruces motorists are advised that Peachtree Hills Rd., between Sonoma Ranch Blvd. and N. Jornada Rd., will be closed beginning Monday, November 24, 2025, for approximately three days. Caliper Construction will be performing work as part of a utility permit. Detours and signage will be in place to direct traffic around the work zone. Motorists are encouraged to seek alternate routes to avoid possible delays. Roadrunner Transit routes will not be affected. This work is taking place in City Council District 5.
Intermittent Lane Closure – Sonoma Ranch Blvd. | Nov. 24 – Dec. 5, 2025
As part of a wire utility permit, Sonoma Ranch Blvd. between Camino Lindo and Camino Coyote will be impacted by intermittent lane closures beginning Monday, November 24, 2025, through Friday, December 5, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs. Roadrunner Transit Route 2 and nearby bus stops may be affected. This project is located in City Council District 6.
Shoulder Work – Multiple Streets | Nov. 24 – Dec. 5, 2025
As part of a wire utility permit, shoulder work closures will impact several streets beginning Monday, November 24, 2025, through approximately Friday, December 5, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends. Streets affected include Cave Springs Trail between Crescent Creek Circle and Mission Road, Warm Springs Lane between Cave Springs Trail and Mission Road, Mission Road between Cave Springs Trail and Golf Club Road, and Cactus Gulch Way between Warm Springs Lane and Cave Springs Trail. All work is located in City Council District 6. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Hoagland Road Lane Shift | Friday, Nov. 21, 2025
Hoagland Road will be experiencing a lane shift from Chateau Dr. to Highland Ave. on Friday November 21, 2025. Two-way traffic on Dunn Drive will be maintained at all times.
Cobb Fendley will be performing field measurements in the vicinity.
Access to residences and businesses will be maintained throughout the project. Roadrunner Transit Routes will not be affected. Commuters are urged to follow all posted signs.
La Melodia (La Camelia Drive to Paseo de Dia) Shoulder Work | Through November 26, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures will continue Thursday November 20, 2025, through approximately Wednesday November 26, 2025.
This will take place at La Melodia between La Camelia Drive to Paseo de Dia.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes and bus stops will not be affected.
Shoulder Work Closures (Various Streets) Through Nov. 26, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures beginning Friday November 21, 2025, through Saturday November 22, 2025, and will continue Monday November 24, 2025, through Wednesday November 26, 2025.
The streets include:
· Calle Belleza between Sonoma Springs Ave. to Tres Ninos Drive.
· Camino Lindo between Calle Belleza to Sonoma Ranch Blvd.
· Tres Ninos Drive between Camino Lindo to Calle Belleza.
For the public’s convenience, access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes and bus stops may not be affected.
Street Work Notice – Fiber Line Installations | November 19, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Embassy Dr & Hoagland Rd (underground)
- Cave Spring Trl & Warm Springs Ln (underground)
- Calle Aguila Dr & Sonoma Springs Ave (underground)
- La Melodia Dr & Howard Pl (underground)
- Majestic Ridge & Hillrise Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closure – Longview Ln. | Nov. 20 – Nov. 26, 2025
As part of the Arroyos at Settlers Pass Phase 2 subdivision, Longview Lane will be impacted by intermittent lane closures beginning Thursday, November 20, 2025, through Wednesday, November 26, 2025. Work will take place from 7:00 a.m. to 5:00 p.m., Monday through Friday, with no construction activity during evenings or weekends. Access to residences will be maintained throughout the project. Motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be impacted. This project is located in City Council District 5.
Street Work Notice – Fiber Line Installation | November 18, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Sandell Rd & El Paseo Rd (underground)
- Golf Club Rd & Crescent Creek Cir (underground)
- Calle Allegre & Sonoma Springs Ave (underground)
- La Melodia Dr & Paseo De Dia (underground)
- Mormon Dr & Executive Hills Rd (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
North Compress Road Lane Closure
North Compress Road (from Amador Road to Hayner Avenue) will have a lane closure beginning Monday, November 17, 2025. The closure will last for approximately three days.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs. A lane closure will be in effect with the assistance of a flagman operation. The work and lane closure will not affect Roadrunner Transit or transit stops.
RDI will be completing private utility work at this location.
Street Work Notice – Fiber Line Installations November 14, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Sandell Rd & El Paseo Rd (underground – restoration)
- Golf Club Rd & Crescent Creek Cir (underground)
- Cielo Bonito Ct & Spitz St (underground – restoration)
- La Melodia Dr & Paseo De Dia (underground)
- Mormon Dr & Executive Hills Rd (underground)
- Holly Dr & Lilac Dr (aerial)
- Calle Corte & Bella Sierra (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – November 13, 2025
-
Sandell Rd & El Paseo Rd (underground – restoration)
-
Golf Club Rd & Crescent Creek Cir (underground)
-
Cielo Bonito Ct & Spitz St (underground – restoration)
-
La Melodia Dr & Paseo De Dia (underground)
-
Hillrise Dr & Executive Hills Rd (aerial – restoration)
-
Holly Dr & Lilac Dr (aerial)
-
Calle Corte & Bella Sierra (underground)
Shoulder Work – Various Streets | Through Nov. 21, 2025
Shoulder Work Closures Various Streets | Through Nov. 21, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work:
· Sonoma Springs Ave between Bella Sierra Drive to Calle Corte.
· Bella Sierra Drive between Sonoma Ranch Blvd. to Sonoma Springs Ave.
· Bella Sierra Court between Bella Sierra Drive to the end of the street.
Crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity.
Street Work Notice – Various Streets – Nov. 21, 2025
Street Work Notice – November 13-21, 2025
The following streets will be impacted by shoulder work for wire utility permits.
The streets include:
· Calle Griega between Sonoma Springs Ave to Calle Allegre.
· Calle Allegre between Calle Griega to Calle Contendo.
· Calle Contendo between Calle Allegre to Sonoma Springs Ave.
· Corte Aguila between Sonoma Springs Ave to the end of the street.
· Calle Corte between Sonoma Springs Ave to the end of the street.
Crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity.
Shoulder Work – Cave Springs Trail | Nov. 13 – Nov. 28, 2025
As part of a wire utility permit, shoulder work will take place on Cave Springs Trail, between Crescent Creek Circle and Mission Road, beginning Thursday, November 13, 2025, and continuing through approximately Friday, November 28, 2025. This project is located in City Council District 6.
Crews will work Monday through Friday from 7 a.m. to 5 p.m., with no construction during evenings or weekends. Access to all residences and businesses will be maintained throughout the project. Motorists are encouraged to follow all posted signs and drive with caution in the area.
Roadrunner Transit routes and bus stops will not be affected.
Lane Shift – Dunn Dr. | Nov. 10, 2025 (Approx. 1 week)
Beginning Monday, November 10, 2025, Dunn Drive will undergo a lane shift between Aztec Drive and Shannon Road as part of the City of Las Cruces East Mesa Roads and Drainage project. The work, performed by Caliper Construction, is expected to last approximately one week. Two-way traffic will be maintained throughout the duration of the project.
Detours and signage will be in place to help guide motorists safely around the work zone. Drivers are encouraged to seek alternate routes to avoid potential delays. This project is located in Council District 6.
Roadrunner Transit routes will not be affected.
S. Locust St. Lane Closure | Nov 10-14, 2025
Las Cruces Motorists will experience a lane closure for the north bound traffic with a shifted lane on S. Locust St. between Wisconsin Ave. and Wyoming Ave. starting November 10, 2025, through November 14.
H & H Underground will be installing new infrastructure for UPN Fiber.
The lane closure will not affect Roadrunner Transit.
Shoulder Work – La Melodia Dr. | Nov. 6 – Nov. 19, 2025
As part of a wire utility permit, shoulder work will take place on La Melodia Drive, between La Camelia Drive and Paseo de Dia, beginning Thursday, November 6, 2025, and continuing through approximately Wednesday, November 19, 2025. This project is located in City Council District 6.
To minimize disruption, crews will work Monday through Friday from 7 a.m. to 5 p.m., with no construction during evenings or weekends. Access to all residences and businesses will be maintained throughout the project. Motorists are encouraged to follow all posted signs and drive with caution in the area.
Roadrunner Transit routes and bus stops will not be affected.
COMPLETED: Madrid Ave. Extension Project
-
Upgrades to underground utilities
-
New sidewalks for safer pedestrian travel
-
A dedicated bike lane for cyclists
-
Fresh asphalt pavement for smoother driving
-
Landscaped medians
Lane Shift – Solano Dr. | Nov. 6, 2025 (Approx. 1 week)
A lane shift will be in place on Solano Drive, between Las Cruces Avenue and May Avenue, beginning Thursday, November 6, 2025, and continuing for approximately one week. Two-way traffic will be maintained throughout the project.
The work, performed by A & J Boring, involves the installation of underground utilities as part of a wire utility permit. This project is located between City of Las Cruces Council Districts 1 and 3.
Access to all residences and businesses will remain open. Motorists are encouraged to follow all posted signs and drive with caution in the area. The work will take place along Roadrunner Transit Route 8, but no bus stops will be affected
Lane Shift – Jornada Rd. | Nov 6, 2025 (Approx. 1 week)
Beginning Thursday, November 6, 2025, a lane shift will be in place on Jornada Road, between Peachtree Hills Road and High Hopes Road, for approximately one week. Two-way traffic will be maintained throughout the duration of the project.
The work, conducted by Renegade Construction, LLC, involves the installation of a fire hydrant as part of a commercial building permit. This project is located in City of Las Cruces Council District 5.
Access to all residences and businesses will remain open. Motorists are encouraged to follow all posted signs and drive with caution in the area. Roadrunner Transit routes and bus stops will not be affected.
Street Work Notice – Fiber Line Installation | Nov. 4, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Foothills Rd (underground)
- Golf Club Rd & Crescent Creek Cir (underground)
- Cielo Bonita Ct & Spitz St (underground – restoration)
- Camino Coyote & Roadrunner Pkwy (underground)
- Pine Valley St & Thunderbird St (underground – restoration)
- Holly Dr & Lilac Dr (aerial)
- Calle Griega & Bella Sierra Ct (underground)
- Sandell Rd & El Paseo Rd (underground – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage.
Northrise Drive Shoulder Work | Through Nov. 12, 2025
Shoulder work will take place on Northrise Drive between Purple Sage Drive and across from Cross Creek Road for west bound traffic from November 5-12.
ARE Telecommunications LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit. Access to residences and businesses will be maintained during the construction.
Street Work Notice – Fiber Line Installations | November 3, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- Golf Club Rd & Crescent Creek Cir (underground)
- Cielo Bonita Ct & Spitz St (underground – restoration)
- Camino Coyote & Roadrunner Pkwy (underground)
- Pine Valley St & Thunderbird St (underground – restoration)
- Holly Dr & Lilac Dr (aerial)
- Calle Griega & Bella Sierra Ct (underground)
- Sandell Rd & El Paseo Rd (underground – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage.
S. Telshor Blvd. Lane Closure Extension
Las Cruces Motorists will continue to experience a right lane closure on S. Telshor Blvd. between Majestic Terrace Dr. and E. Lohman Ave. The work will be completed by November 11, 2025.
SA Connects will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will affect Roadrunner Transit at bus stop 19 route 2.
Shoulder Work Closures – Wire Utility Project | November 3 – 14, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures will continue Monday November 3, 2025, through approximately Friday November 14, 2025.
The street include:
· Camino Coyote Lane between N Roadrunner Pkwy to East Paseo De Dia. This project is in City Council District 6.
· Paseo De Dia Loop between Camino Coyote West to Camino Coyote East. This project is in City Council District 6.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes 3 and bus stops may be affected.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Shoulder Work Closures – Wire Utility Project | November 3 – 21, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures will begin Monday November 3, 2025, through approximately Friday November 21, 2025.
The street include:
· Crescent Creek Circle between Golf Club Road to Cave Springs Trail. This project is in City Council District 6.
· Golf Club Road between Crescent Creek Circle to Roadrunner Parkway. This project is in City Council District 6.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes and bus stops will not be affected.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Street Work Notice – Fiber Line Installations | October 30, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- El Paseo Rd & Sandell Dr (underground)
- Cielo Bonita Ct & Spitz St (underground – restoration)
- Camino Coyote & Roadrunner Pkwy (underground – restoration)
- Valle Vista & Missouri Ave (underground)
- Pine Valley Dr & Thunderbird Dr (underground)
- Holly Dr & Lilac Dr (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | October 29, 2025
-
S Telshor Blvd & Sundown Rd (underground)
-
El Paseo Rd & Sandell Dr (underground)
-
Cielo Bonita Ct & Spitz St (underground – restoration)
-
E Lohman Ave & Roadrunner Pkwy (underground – restoration)
-
Garrison Rd & Corbett Dr (underground)
-
Valle Vista & S Telshor Blvd (underground)
La Llorona Parking Lot Closure | Oct. 29 – Nov. 7, 2025
The parking lot on the south side of La Llorona Park will be closed for asphalt resurfacing for about a week and a half.
The closure will begin on Wednesday, October 29, and possibly continue through Friday, November 7, 2025.
Street Work Notice – Fiber Line Installations – October 28, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- El Paseo Rd & Sandell Dr (underground)
- Cielo Bonita Ct & Spitz St (underground – restoration)
- E Lohman Ave & Roadrunner Pkwy (underground – restoration)
- Garrison Rd & Corbett Dr (underground)
- Valle Vista & S Telshor Blvd (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closure: El Paseo Road | Oct. 28 – 31, 2025
Southbound commuters on El Paseo Rd. (between Monte Vista and University Ave.) will experience intermittent lane closures on Tuesday, October 28, 2025 through Friday, October 31, 2025.
SA Connects will be placing underground utilities as part of a wire utility permit.
The work will not affect any Roadrunner Transit Routes or bus stops. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
Street Work Notice – Fiber Line Installations | October 27, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- Calle Griega & Demos Ave (underground)
- Cielo Bonita Ct & Spitz St (underground – restoration)
- E Lohman Ave & Roadrunner Pkwy (underground – restoration)
- Winton Cir & Flora Vista Dr (underground – restoration)
- Valle Vista & S Telshor Blvd (underground)
- Calle de Salud & S Don Roser Dr (underground)
- Corn Dr & Cotton Ave (underground)
- Garrison Rd & Corbett Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closure – S. Telshor Blvd. | Oct. 27 – Oct. 31, 2025
As part of a wire utility permit, the intersections of S. Telshor Boulevard and E. Idaho Avenue will be impacted by intermittent lane closures in both the northbound and southbound directions. The work will take place Monday, October 27, 2025, through Friday, October 31, 2025.
The intermittent lane closures may impact Roadrunner Transit Route 3. This work is being done in City Council Districts 2 and 3.
Shoulder Work – E. Idaho Ave. | Oct. 27 – Oct. 31, 2025
Shoulder work will take place along E. Idaho Avenue, from the intersection of E. Idaho Avenue and S. Telshor Boulevard to the intersection of Mall Drive and E. Idaho Avenue, beginning Monday, October 27, 2025, through Friday, October 31, 2025.
H&H Underground will be performing the work as part of a wire utility permit.
The shoulder work may impact Roadrunner Transit Route 3. This work is being done in City Council District 3.
Street Work Notice – Fiber Line Installations | October 24, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- Calle Griega & Demos Ave (underground)
- Cielo Bonita Ct & Spitz St (underground – restoration)
- E Lohman Ave & Roadrunner Pkwy (underground – restoration)
- Winton Cir & Flora Vista Dr (underground – restoration)
- Valle Vista & S Telshor Blvd (underground)
- S Telshor Blvd & Pebble Beach Rd (underground)
- Corn Dr & Cotton Ave (underground)
- Garrison Rd & Corbett Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work – Sonoma Ranch Blvd. | Oct. 27 – Oct. 31, 2025
As part of a wire utility permit, shoulder work closures will take place along Sonoma Ranch Boulevard, between Demos Avenue and Camino Lindo, beginning Monday, October 27, 2025, through approximately Friday, October 31, 2025.
For the public’s convenience, crews will work Monday through Friday from 7 a.m. to 5 p.m., leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs.
This work is taking place in City Council District 6. Roadrunner Transit Route 2 and nearby bus stops may be affected.
Street Work Notice – Fiber Line Installations | October 23, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- Calle Griega & Demos Ave (underground)
- Cielo Bonito Ct & Spitz St (underground – restoration)
- E Lohman Ave & Roadrunner Pkwy (underground – restoration)
- Mall Dr & S Telshor Blvd (underground – restoration)
- Valle Vista & S Telshor Blvd (underground)
- Aguirre Ct & Memorial Ct (underground)
- Corn Dr & Cotton Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | October 22, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Telshor Blvd & Sundown Rd (underground)
- Calle Griega & Demos Ave (underground)
- Cielo Bonito Ct & Spitz St (underground – restoration)
- E Lohman Ave & Paseo De Oñate (underground – restoration)
- Mall Dr & S Telshor Blvd (underground – restoration)
- Valle Vista & S Telshor Blvd (underground)
- Aguirre Ct & Memorial Ct (underground)
- Corn Dr & Cotton Ave (underground)
- Wisconsin Ave & Locust St (underground – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage
Street Work Notice – Fiber Line Installations | Oct. 21, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Monte Vista Ave & S Espina St (aerial – restoration)
- Calle Griega & Demos Ave (underground)
- Suzanne Ave & Spitz St (underground – restoration)
- E Lohman Ave & Paseo De Oñate (underground – restoration)
- Valle Vista & S Telshor Blvd (underground)
- Aguirre Ct & Memorial Ct (underground)
- Cotton Ave & Chile Ln (underground)
- S Telshor Blvd & Sundown Rd (underground)
- Wisconsin Ave & Locust St (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Lane Closure – E. Northrise Dr. | Oct. 22 – Oct. 29, 2025
Lane closures will be in effect beginning Wednesday, October 22, 2025, in the westbound lane of E. Northrise Drive, between Roadrunner Parkway and Venus Street. Traffic control will be in place, and motorists are asked to follow all posted signage. The closure will remain in effect for the entire duration of the project, which is expected to be completed by Wednesday, October 29, 2025.
Sandoval Construction will be installing a sidewalk along Northrise Parkway. This work is taking place in City Council District 3, and Roadrunner Transit routes will not be affected. The City has verified that no conflicting public or private construction projects will occur in the immediate area during this time.
Lane Closure – Elks Dr. | Oct. 21, 2025 (One day closure)
Las Cruces motorists are advised that lane closures will be in place on Elks Drive, between N. Main Street and Lenox Avenue, beginning Tuesday, October 21, 2025, for one day. During this time, northbound and southbound traffic will utilize the inside lanes for travel. H&H Underground Construction will be potholing existing underground infrastructure to install new underground fiber as part of a utility permit. Access to residences and businesses will be maintained during construction, and Roadrunner Transit will not be affected. This work is taking place in City Council District 1.
Lane Closure – S. Valley Dr. | Oct. 20 – Oct. 24, 2025
Las Cruces motorists are advised that a right turn lane closure will be in place on S. Valley Drive, between Enterprise (1340 S. Valley Drive) and Hickory Drive, beginning Monday, October 20, 2025, through Friday, October 24, 2025. 7B Development will be installing a new driveway in the area. Motorists are encouraged to seek alternative routes to avoid possible delays. Roadrrunner Transit will not be affected.
2025–2026 Micro-Surface Project – Intermittent Street Closures
As part of the 2025–2026 Micro-Surface Project, several Las Cruces streets will experience intermittent closures beginning Monday, October 20, 2025, through approximately Wednesday, October 22, 2025.
The affected streets include:
-
Mall Drive: From Idaho Avenue to Telshor Boulevard (City Council District 3)
-
Doral Court: From Telshor Boulevard to cul-de-sac (City Council District 3)
-
Enchanted Drive: From Missouri Avenue to Candlelight Drive (City Council District 2)
-
Salinas Drive: From Desert Sands Street to Fairway Drive (City Council District 2)
-
Buena Vida Circle: From Telshor Avenue to Terrace Drive (City Council District 2)
-
Buena Vida Court: From Telshor Boulevard to cul-de-sac (City Council District 2)
For the public’s convenience, crews will work from 7 a.m. to 5 p.m., leaving evenings free of construction activity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit routes and bus stops will not be affected.
Street Work Notice – Fiber Line Installation – Oct. 20, 2025
-
Garrison St & Myrtle Ave (aerial – restoration)
-
Calle Griega & Demos Ave (underground)
- Suzanne & Spitz (underground -restoration)
-
E. Lohman and Paseo De Onate (underground – restoration)
-
Winon and McClure (underground – restoration)
-
Valle Vis & S. Telshor Blvd. (underground)
-
Terrace Ct & Memorial Ct (underground)
-
Cotton Ave & Chile Ln (underground)
- S Telshor Blvd & Sundown Rd (underground)
-
Wisconsin Ave & Locust (underground)
Shoulder Work – Triviz Dr. | Oct. 21 – Oct. 24, 2025
Las Cruces motorists are advised that shoulder work will take place along N. Triviz Drive, near the intersection of Boxster Way, beginning Tuesday, October 21, 2025, through Friday, October 24, 2025. H&H Underground will be performing the work as part of a wire utility permit. The shoulder work may impact Roadrunner Transit Route 1. This project is taking place in City Council District 1.
Shoulder Work Closure – Demos Ave. | Oct. 16 – Oct. 22, 2025
As part of a wire utility permit, shoulder work closures will continue on Demos Avenue, between Sonoma Ranch Boulevard and the end of pavement, beginning Thursday, October 16, 2025, through approximately Wednesday, October 22, 2025. For the public’s convenience, crews will work from 7 a.m. to 5 p.m., Monday through Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit Route 2 and nearby bus stops may be affected. This project is taking place in City Council District 6.
Street Work Notice | Fiber Line Installation – Oct. 16, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Garrison St & Myrtle Ave (aerial – restoration)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Roualt Dr & Spitz St (underground – restoration)
- Paseo De Oñate & Pinnacle View Dr (underground – restoration)
- Neleigh Way & Santa Monica Dr (underground – potholing)
- S Telshor Blvd & Doral Pl (underground)
- El Dorado Ct & S Telshor Blvd (underground)
- Cotton Ave & Chile Ln (underground)
- S Telshor Blvd & Sundown Rd (underground)
- Wisconsin Ave & S Travis St (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work – Multiple Roads | Oct. 17 – Oct. 24, 2025
Las Cruces motorists are advised that shoulder work will take place at the following locations beginning Thursday, October 17, 2025, through Thursday, October 24, 2025:
-
Missouri Avenue – eastbound traffic between Ridgemont Drive and High Street
-
S. Telshor Boulevard – northbound traffic between Fairway Drive and Missouri Avenue
-
S. Telshor Boulevard – southbound traffic between Missouri Avenue and Fairway Drive
-
Valle Vista – between S. Telshor Boulevard and the cul-de-sac
Regal Utilities will be installing underground infrastructure for Vexus Fiber as part of a utility permit. Access to residents will be maintained throughout construction, and Roadrunner Transit will not be affected. This work is taking place in City Council District 2.
Street Work Notice – Fiber Line Installations | October 15, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Garrison St & Myrtle Ave (aerial – restoration)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Roualt Dr & Spitz St (underground – restoration)
- Paseo De Oñate & Pinnacle View Dr (underground – restoration)
- Neleigh Way & Santa Monica Dr (underground – potholing)
- S Telshor Blvd & Doral Pl (underground)
- El Dorado Ct & S Telshor Blvd (underground)
- Cotton Ave & Chile Ln (underground)
- S Telshor Blvd & Sundown Rd (underground)
- Wisconsin Ave & S Travis St (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations October 14, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Locust St & Myrtle Ave (aerial – restoration)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Rouault Dr & Spitz St (underground – restoration)
- Paseo De Oñate & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Dr (underground – restoration)
- S Telshor Blvd & Doral Ct (underground)
- El Dorado Ct & S Telshor Blvd (underground)
- Cotton Ave & Chile Ln (underground)
- S Telshor Blvd & Sundown Rd (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
2025-2026 Micro-Surface Project – Intermittent Lane Closures- Extended Oct. 14 – Oct. 16, 2025
As part of the 2025-2026 Micro-Surface Project, several city streets will experience intermittent lane closures from Tuesday, October 14, 2025, until approximately Thursday, October 16, 2025.
The streets include:
- Frida Dr: From Calle de Nubes to Engler Rd. This project is in City Council District 5.
- Sunny Acres Dr: From Peachtree Hills Rd. to Mesa Dr. This project is in City Council District 6.
- Calle de Nubes (East): From Norte Luz Dr. to Norte Luz Dr. This project is in City Council District 5.
- Jewel Ct: From Arena Dr. to EOP. This project is in City Council District 5.
- Jasper Ct: From Arena Dr. to EOP. This project is in City Council District 5.
- Tanzanite Rd: From Arena Dr. to EOP. This project is in City Council District 5.
- Granite St: From Las Colinas Dr. to Tanzanite Rd. This project is in City Council District 5.
- Pyrite St: From Granite St. to Arena Dr. This project is in City Council District 5.
- Isabella Ct: From Las Colinas Dr. to EOP. This project is in City Council District 5.
- Chromite Ct: From Arena Dr. to EOP. This project is in City Council District 5.
- Damonite Ct: From Arena Dr. to EOP. This project is in City Council District 5.
- Lamanite Ct: From Arena Dr. to EOP. This project is in City Council District 5.
- Ivory Ct: From Arena Dr. to EOP. This project is in City Council District 5.
- Pearl Ct: From Arena Dr. to EOP. This project is in City Council District 5.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. leaving evenings free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Street Work Notice – Fiber Line Installations | Oct. 10 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Locust St & Myrtle Ave (aerial – restoration)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Rouault Dr & Spitz St (underground – restoration)
- Paseo De Oñate & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Dr (underground – restoration)
- Imperial Ridge & Enchanted Dr (aerial)
- El Dorado Ct & Buena Vida Cir (underground)
- Corn Dr & Farm Crossing Rd (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | October 9, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Locust St & Myrtle Ave (aerial – restoration)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Rouault Dr & Spitz St (underground – restoration)
- Paseo De Oñate & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Dr (underground – restoration)
- Imperial Ridge & Enchanted Dr (aerial)
- El Dorado Ct & Buena Vida Cir (underground)
- Corn Dr & Farm Crossing Rd (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closures and Shoulder Work – Lohman Ave. | Oct. 10, 2025 (Approx. 2 weeks)
Las Cruces motorists are advised that Lohman Ave., between Roadrunner Pkwy. and Paseo de Oñate, will experience intermittent lane closures and shoulder work beginning Friday, October 10, 2025. SA Connects will be installing new telecommunication infrastructure for Metronet, with work expected to take approximately two weeks to complete. Access to residences and businesses will be maintained throughout the project, and Roadrunner Transit will not be affected. This work is taking place in City Council Districts #3 and #6.
Shoulder Work – Claude Dove Dr. | Oct. 10 – Oct. 14, 2025
Las Cruces motorists will experience shoulder work on Claude Dove Dr., approximately 200 feet from the S. Telshor Blvd. intersection for eastbound traffic, beginning Friday, October 10, 2025, through Tuesday, October 14, 2025. Regal Utilities will be installing underground infrastructure for Vexus Fiber as part of a utility permit. Access to residents will be maintained throughout the construction period, and Roadrunner Transit will not be affected. This work is taking place in City Council District #2.
Shoulder Work – Majestic Ridge | Oct. 10 – Oct. 14, 2025
Las Cruces motorists will experience shoulder work on Majestic Ridge between S. Telshor Blvd. and Mormon Dr. beginning Friday, October 10, 2025, through Tuesday, October 14, 2025. Regal Utilities will be installing underground infrastructure for Vexus Fiber as part of a utility permit. Access to residents will be maintained throughout construction, and Roadrunner Transit will not be affected. This work is taking place in City Council District #2.
Street Work Notice – Fiber Line Installations | Oct. 8, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Locust St & Myrtle Ave (aerial)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Rouault Dr & Spitz St (underground – restoration)
- Paseo De Oñate & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Dr (underground – restoration)
- Imperial Ridge & Enchanted Dr (aerial)
- El Dorado Ct & Buena Vida Cir (underground)
- Cotton Ave & Chile Ln (underground – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice Sonoma Ranch Blvd. | October 15-17, 2025
Sonoma Ranch Blvd. between Mission Nuevo to Demos Ave. will be impacted by shoulder work as part of a wire utility permit.
This will take place Wednesday October 15, 2025, through approximately Friday October 17, 2025.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday.
Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Route 2 and bus stops may be affected.
Shoulder Work on California Avenue | Oct. 20-24, 2025
Shoulder work will take place on California Ave. between S. Solano Dr. and Chaparro St. from October 20-24.
El Paso Electric will be working on aerial infrastructure.
The shoulder work will not affect Roadrunner Transit.
S. Walnut Lane Closure | October 27, 31, 2025
A lane closure will take place on S. Walnut St. for the south bound traffic 200 feet on either side of the E. Lohman Ave. intersection. A drop lane will be provided for the south bound traffic to provide traffic flow to the south. Work will start October 27, 2025, through October 31.
El Paso Electric will be working on aerial infrastructure.
The shoulder work will not affect Roadrunner Transit.
Jayne Lane Shoulder Work | October 23-24, 2025
Shoulder work will take place on Jayne Ln. between Evelyn St. and Debra St. October 23-24, 2025.
El Paso Electric will be working on aerial infrastructure.
The shoulder work will not affect Roadrunner Transit.
N. Virginia St Road Closure | October 22
A road closure will take place on N. Virginia St. between Pinon Ave. and E. Picacho Ave. starting October 22, 2025.
El Paso Electric will be working on aerial infrastructure.
The shoulder work will not affect Roadrunner Transit.
Intermittent Lane Closures – Micro-Surface Project | Oct. 6 – Oct. 11, 2025
Intermittent Lane Closures
-
When: Monday, October 6, 2025 – Saturday, October 11, 2025
-
Where: The following streets will be affected:
• Calle Aplanado – Camino dos Vidas to Engler Rd.
• Frida Dr. – Calle de Nubes to Engler Rd.
• Norte Luz Dr. – Engler Rd. to Camino dos Vidas
• Sunny Acres Dr. – Peachtree Hills Rd. to Mesa Dr.
• Calle de Nubes (East) – Norte Luz Dr. to Norte Luz Dr.
• Camino dos Vidas
• Jewel Ct. – Arena Dr. to EOP
• Jasper Ct. – Arena Dr. to EOP
• Tanzanite Rd. – Arena Dr. to EOP
• Granite St. – Las Colinas Dr. to Tanzanite Rd.
• Pyrite St. – Granite St. to Arena Dr.
• Isabella Ct. – Las Colinas Dr. to EOP
• Chromite Ct. – Arena Dr. to EOP
• Damonite Ct. – Arena Dr. to EOP
• Lamanite Ct. – Arena Dr. to EOP
• Ivory Ct. – Arena Dr. to EOP
• Pearl Ct. – Arena Dr. to EOP
-
Details:
-
Work hours: 7 a.m. to 5 p.m., Monday–Saturday
-
Evenings will be free of construction activity.
-
Access to residences and businesses will be maintained.
-
Motorists are urged to follow all posted signs.
-
Roadrunner Transit routes and bus stops will not be affected.
Carlyle Drive Shoulder Work | October 21-31, 2025
Shoulder work will take place on Carlyle Dr. between Hoagland Rd. and Amy Pl. between October 21 and 31.
El Paso Electric will be working on aerial infrastructure.
The shoulder work will not affect the Roadrunner Transit.
Street Work Notice – Fiber Line Installations | October 4, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Locust St & Myrtle Ave (aerial)
- Demos Ave & Sonoma Ranch Blvd (underground)
- Roualt Dr & Spitz St (underground – restoration)
- Los Arboles Dr & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Loop (underground – restoration)
- Imperial Ridge & Enchanted Dr (aerial – restoration)
- S Telshor Blvd & Terrace Dr (underground)
- Cotton Ave & Chile Ln (underground – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closures – Micro-Surface Project | Oct. 9 – Oct. 11, 2025
2025-2026 Micro-Surface Project – List 3
As part of the 2025-2026 Micro-Surface Project, several Las Cruces streets will experience intermittent lane closures beginning Thursday, October 9, 2025, through approximately Saturday, October 11, 2025. Streets affected include Del Monte Street (from Lohman Avenue to Griggs Avenue), Doña Ana Street (from Lohman Avenue to Las Cruces Avenue), Lees Drive (from Idaho Avenue to Montana Avenue), Lester Avenue (from Nevada Avenue to Lester Court), Nevares Street (from Griggs Avenue to Las Cruces Avenue), Bowman Avenue (from Solano Drive to Doña Ana Street), Andrews Drive (from Pecos Street to Locust Street), Colorado Avenue (from Solano Drive to Smith Avenue), Mimbres Street (from Arizona Avenue to Smith Avenue), Rio Grande Street (from Nevada Avenue to Lees Drive), and Utah Avenue (from Solano Drive to Luna Street).
All work will occur between 7 a.m. and 5 p.m., with evenings free of construction activity. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. RoadRUNNER Transit routes and bus stops will not be affected.
Street Work Notice – Fiber Line Installations | Oct. 6, 2025
-
S Locust St & Myrtle Ave (aerial)
-
Mission Nuevo Dr & Sonoma Springs Ave (underground)
-
Cielo Vista Ct & Tonja Ct (underground – restoration)
-
Los Arboles Dr & Pinnacle View Dr (underground – restoration)
-
Freedom Dr & Friendship Dr (underground – restoration)
-
Imperial Ridge & Enchanted Dr (aerial – restoration)
-
Terrace Dr & S Telshor Blvd (underground)
-
John St & S Triviz Dr (aerial)
-
Cotton Ave & Chile Ln (underground – restoration)
Road Closure – Hickory Dr | Current – Oct. 24, 2025
Las Cruces motorists are advised that Hickory Drive, between Avenida De Mesilla and 1500 Hickory Drive, will continue to experience a northbound road closure through Thursday, October 24, 2025. 7B Development was installing a new sewer main line and has encountered an issue that requires resolution. Motorists are encouraged to seek alternative routes to avoid possible delays. Roadrunner Transit Route 4 will be affected, including bus stop 6 at Walmart. This work is taking place in City Council District 4.
Road Closure – Griggs Ave | Oct. 6 – Oct. 10, 2025
Las Cruces motorists are advised that Griggs Avenue, between Nevarez Street and Hermosa Street, will be closed to thru traffic beginning Monday, October 6, 2025, for the construction of speed tables. The project, expected to last approximately one week until Friday, October 10, 2025, is being performed by Sandoval Construction. Access to residences and businesses will be maintained during construction, with detour routes available around the work zone. Motorists are urged to follow all posted signs and consider alternative routes to avoid possible delays. Roadrunner Transit routes will not be affected. This work is taking place in City Council District 3.
Intermittent Lane Closures – Northrise Dr | Oct. 14 – Oct. 17, 2025
Las Cruces motorists are advised that Northrise Drive, between Sonoma Ranch Boulevard and Triumph Court, will experience intermittent lane closures beginning Tuesday, October 14, 2025, through Friday, October 17, 2025, as part of a utility permit project. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit Route 3 or nearby bus stops may be impacted. This project is taking place in City Council District 6.
Intermittent Lane Closures – Sonoma Ranch Blvd | Oct. 6 – Oct. 10, 2025
Las Cruces motorists are advised that Sonoma Ranch Boulevard, between Garden Sage Way and the intersection of Sonoma Ranch and Northrise Drive, will experience intermittent lane closures beginning Monday, October 6, 2025, through Friday, October 10, 2025, as part of a utility permit project. Access to residences and businesses will be maintained throughout the project, and motorists are urged to follow all posted signs. Roadrunner Transit Route 3 or nearby bus stops may be impacted. This project is taking place in City Council District 6.
Street Work Notice – Fiber Line Installations | Oct. 3, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Holly Dr & Lilac Dr (aerial)
- Mission Nuevo Dr & Sonoma Springs Ave (underground)
- Cielo Vista Dr & Tonja Ct (underground – restoration)
- Los Arboles Dr & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Loop (underground – restoration)
- Imperial Ridge & Enchanted Dr (aerial – restoration)
- La Paloma Dr & Terrace Ct (underground)
- John St & S Triviz Dr (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Closure – Dunn Dr | Oct. 6 – Oct. 11
Las Cruces motorists are advised that Dunn Drive, between Reynolds Drive and Aldrich Road, will be closed for road work starting Monday, October 6, 2025, lasting approximately five (5) days. Caliper Construction will be performing the work as part of the City of Las Cruces East Mesa Roads and Drainage project. Detours and signage will be in place to direct traffic around the work zone. Motorists are encouraged to seek alternative routes to avoid possible delays. Roadrunner Transit routes will not be affected. This project is taking place in City Council District 6.
Road Closure – Sonoma Ranch Blvd | Oct. 6 – Oct. 10, 2025
Las Cruces motorists are advised that Sonoma Ranch Boulevard, between Peachtree Hills Road and Arroyo Road, will be closed for road work starting Monday, October 6, 2025, through Friday, October 10, 2025. Caliper Construction will be performing the work as part of the Metro Verde North Ph.1 Subdivision. Access for residents and businesses may be limited during the closure. Roadrunner Transit will not be affected. This project is taking place in City Council District 5.
Shoulder Work – S Triviz Dr | Oct 6, 2025
Las Cruces motorists are advised that South Triviz Drive, between Wisconsin Avenue and East University Avenue, will experience shoulder work starting Monday, October 6, 2025. H&H Underground, under contract with Unite Private Networks, will be installing new telecommunication infrastructure. The work is expected to take approximately one week to complete. Access to residences and businesses will be maintained during construction, and Roadrunner Transit will not be affected. This project is taking place in City Council District 2.
Shoulder Work Closures – Demos Ave & Sonoma Ranch Blvd | Oct. 2 – Oct. 15, 2025
Las Cruces motorists will experience shoulder work closures beginning Wednesday, October 2, 2025, through Wednesday, October 15, 2025. No work will take place on Monday, October 13, 2025, in observance of the holiday. The work will take place on Demos Avenue, between Sonoma Ranch Boulevard and the end of pavement, and on Sonoma Ranch Boulevard, between Mission Nuevo and Demos Avenue, both in City Council District 6. Crews will work from 7 a.m. to 5 p.m., Monday through Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project, but motorists are urged to follow all posted signs. Roadrunner Transit Route 2 and bus stops may be affected.
Street Work Notice – Fiber Line Installations | October 2, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Holly Dr & Lilac Dr (aerial)
- Mission Nuevo Dr & Sonoma Springs Ave (underground)
- Cielo Bonita Ct & Tonja Ct (underground – restoration)
- Los Arboles Dr & Pinnacle View Dr (underground – restoration)
- Freedom Dr & Friendship Dr (underground – restoration)
- Seneca Dr & Akers St (aerial)
- Calle de Salud & La Senda Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Micro-Surface Project Intermittent Lane Closures (Various Streets) | October 1 – 4, 2025
As part of the 2025-2026 Micro-Surface Project, several city streets will experience intermittent lane closures from Wednesday, October 1, 2025, until approximately Saturday, October 4, 2025.
The streets include:
· Calle Aplanado: From Camino dos Vidas to Engler Rd.
· Frida Dr: From Calle de Nubes to Engler Rd.
· Norte Luz Dr: From Engler Rd. to Camino dos Vidas.
· Reina Dr: From Elks Dr. to Fran Dr.
· Venus St: From Northrise Dr. to Bataan Memorial.
· Camino del Rex: From Valencia Dr. to Edge-of-Pavement.
· Mall Dr: From Idaho Ave. to S. Telshor Blvd.
· Salinas Dr: From Desert Sands St. to Fairway Dr.
· Del Monte St: From Lohman Ave. to Griggs Ave.
· Dona Ana St: From Lohman Ave. to Las Cruces Ave.
· Lees Dr: From Idaho Ave. to Montana Ave.
· Lester Ave: From Nevada Ave. to Lester Ct.
· Alliance Dr: From Advancement Ave. to Cul-de-Sac.
· Industrial Park Ave: From Rea Blvd. to Alliance Dr.
Crews will only work from 7 a.m. to 5 p.m. leaving evenings free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops will not be affected.
Lane Closure on S. Main Street | October 2 -3, 2025
There will be a right turn lane closure for Avenida de Mesilla on S. Main St. starting October 2, 2025, through October 3.
Kelly Cable will be potholing the existing Lumen infrastructure to acquire the depth for design work.
The lane closure will not affect the Roadrunner Transit.
Street Work Notice – Fiber Line Installations | Sept. 30, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Valley View Ave & Harrison St (aerial)
- Mission Nuevo Dr & Sonoma Springs Ave (underground)
- Cielo Bonita Ct & Topley Ave (underground – restoration)
- Los Arboles Dr & Pinnacle View Dr (underground – restoration)
- Mall Dr & S Telshor Blvd (underground)
- Hermosillo Pl & Hermosillo St (aerial)
- Claude Dove Dr & High St (underground – potholing)
- Majestic Ridge & Roadrunner Cir (underground – potholing)
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work Camino Coyote| Mon. Sept. 29 – Wed. Oct. 1, 2025
Shoulder work will be in place on Camino Coyote between Roadrunner Pkwy. and Paseo de Dia starting Monday, September 29, 2025, through Wednesday, October 1, 2025. H & H Underground will be placing underground utilities in the area.
Access to residences and businesses will be maintained throughout the project. Roadrunner Transit Routes will not be affected. Commuters are urged to follow all posted signs.
Shoulder Work – S. Telshor Blvd. | Sept. 29 – Oct.15, 2025
Shoulder work will be taking place on S. Telshor Blvd. between E. University Ave. to Terrace Drive. The shoulder work will also be taking place from the intersection of Memorial Court and S. Telshor Blvd. to Citizens Place. The shoulder work will begin Monday September 29, 2025, through approximately Wednesday October 15, 2025. No work shall take place on Monday October 13, 2025.
Conterra Networks will be doing the work as part of a wire utility permit.
The shoulder work may impact the RoadRUNNER Transit route 2.
Shoulder Work – Mission Nuevo | Sept. 29 – Oct 15, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures beginning Monday September 29, 2025, through approximately Wednesday October 15, 2025. No work shall take place on Monday October 13, 2025, as it is a holiday.
The street includes:
Mission Nuevo between Sonoma Ranch Blvd. to Sonoma Springs Ave.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
RoadRUNNER Transit Routes 2 and bus stops may be affected.
Road Maintenance – Various Streets | Sept. 29 – Oct. 3, 2025
Streets Management will be applying Fog Seal surface treatment on various city streets on Monday, September 29, 2025, through Friday, October 3, 2025, with expected completion in Five (5) days. Residents and businesses will be notified 24 hours prior to work beginning.
Streets to be affected include.
· Hillsdale St. from Devendale Dr. to Glendale Dr. Work will take place in City Council District # 1
· Cedardale Dr. from Devendale Ave. to Elks Dr. Work will take place in City Council District # 1
· Bloomdale Dr. from Devendale Ave. to Elks Dr. Work will take place in City Council District # 1
· Old Farm Rd. from North Park Rd. to North Park Rd. Work will take place in City Council District # 2
· North Park Rd. from Yale Dr. to Yale Dr. Work will take place in City Council District # 2
· E’ Mountain Ave. from Solano Dr. to Tornillo St. Work will take place in City Council District # 1
· Augustine Ave. from Solano Dr. to Manzanita St. Work will take place in City Council District # 1
· Lucero Ave. from Almendra St. to Tornillo St. Work will take place in City Council District # 1
· Espina St. from Hadley Ave. to Virginia St. Work will take place in City Council District # 1
· Newcomb St. from Melendres St. to Mesilla St. Work will take place in City Council District # 4
· Pueblo St. from Newcomb St.to Parker Rd. Work will take place in City Council District # 4
· Lees Dr. from Idaho Ave to Montana Ave. Work will take place in City Council District # 3
· Gladys Dr. from Missouri Ave. to Calle de Suenos, Work will take place in City Council District # 3
· Calle de Suenos from Gladys Dr. to Stull Dr. Work will take place in City Council District # 3
· Concord Ave. from Gladys Dr. to Stull Dr. Work will take place in City Council District # 3
· Magnolia Ave. from Gladys Dr. to Stull Dr. Work will take place in City Council District # 3
· Pebble Beach Rd. from Buena Vida Cir. to Buena Vida Cir. Work will take place in City Council District # 2
· Pine Valley St. from Buena Vida Cir. to Pebble Beach Rd. Work will take place in City Council District # 2
· Thunderbird St. from Pebble Beach Rd. to Pine Valley St. Work will take place in City Council District # 2
· Jimmie Ln from Cortez Rd. to EOP, Work will take place in City Council District # 6
For the public’s convenience, crews will work from 7 a.m. to 5 p.m., Monday, September 29, 2025, through Friday, October 3, 2025. Access to residences and businesses will be maintained with periodic closures during the construction period. Motorists are urged to use caution through this area or use alternate routes.
Roadrunner Transit routes will not be affected. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
For information contact the Public Works Department/Street Management section at 575/541-2595. The TTY number is 575/541-2182.
Street Work Notice – Fiber Line Installations | Sept. 25, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Holly Dr & Lilac Dr (aerial)
- Enchanted Dr & Missouri Ave (underground)
- Spitz St & Rouault Ave (underground)
- Los Arboles Dr & Pinnacle View Dr (underground)
- Mall Dr & S Telshor Blvd (underground – restoration)
- Missouri Ave & Boston Dr (underground)
- Seneca Dr & Akers Dr (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Lane Closure and Shoulder Work – Amador Ave. | Sept. 26, 2025
On September 26, 2025, motorists in Las Cruces can expect a temporary lane closure at 2050 W Amador Avenue for approximately two hours, followed by shoulder work that will continue for the rest of the day. The work, located in Council District #4, involves the installation of underground infrastructure for CONTERRA Fiber by A & J Boring as part of a utility permit. Roadrunner Transit services will not be affected during this time, and access to residents will be maintained throughout the construction.
Street Work Notice – Fiber Line Installations | Sep. 24, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Holly Dr & Lilac Dr (aerial)
- Myrtle Ave & Thomas Dr (underground)
- Cedardale Loop & Jennifer St (underground)
- Pinnacle View Dr & Oro Viejo Rd (underground)
- Mall Dr & S Telshor Blvd (underground – restoration)
- Missouri Ave & Boston Dr (underground)
- Seneca Dr & Akers St (aerial)
- Enchanted Dr & Missouri Ave (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Maintenance and Fog Seal Work on Various Streets – September 25-26, 2025
Streets Management will be applying Fog Seal surface treatment on various city streets on Thursday, September 25, 2025, and Friday, September 26, 2025, from 7 a.m. to 5 p.m.
Streets affected include Camino de Rex (Valencia Dr. to EOP) in City Council District #1, and Buena Vida Ct. (Telshor Blvd to Cul-de-Sac) and Buena Vida Cir. (Telshor Blvd to Terrace Dr.) in City Council District #2.
Work is expected to be completed in two days, and residents and businesses will be notified 24 hours prior to the start of construction. Access to homes and businesses will be maintained, with periodic closures during work hours. Motorists are urged to use caution or consider alternate routes. Roadrunner Transit routes will not be affected, and no conflicting public or private construction projects are scheduled in the area during this time.
Street Work Notice – Fiber Line Installations | Sept. 23, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Milton Ave & College St (aerial – restoration)
- Myrtle Ave & Thomas Dr (underground)
- Rouault Ave & Spitz St (underground)
- Pinnacle View Dr & Oro Viejo Rd (underground)
- Mall Dr & S Telshor Blvd (underground)
- Missouri Ave & Boston Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Closure – Sonoma Ranch Blvd | Sept. 22 – Oct. 3, 2025
A road closure will continue along Sonoma Ranch Boulevard between Peachtree Hills Road and Arroyo Road from Monday, September 22, 2025, through Friday, October 3, 2025. Caliper Construction will be completing work as part of the Metro Verde North Phase 1 Subdivision. Roadrunner Transit routes will not be impacted during this project, which is taking place in City Council District 5.
Street Work Notice – Fiber Line Installations | Sept. 22, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Locust St & Anderson Dr (aerial – restoration)
- Milton Ave & Turrentine Dr (underground)
- Rouault Ave & Spitz St (underground)
- Oro Viejo Rd & Vista Primera Rd (underground)
- Mall Dr & S Telshor Blvd (underground)
- Elks Dr & Desert Candle Dr (aerial – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | Sept. 19, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Locust St & Anderson Dr (aerial – restoration)
- Wisconsin Ave & S Triviz Dr (underground)
- Cedardale Loop & Spitz St (underground)
- Oro Viejo Rd & Vista Primera Rd (underground)
- Mall Dr & S Telshor Blvd (underground – potholing)
- Elks Dr & Desert Candle Dr (aerial – restoration)
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work – Enchanted Dr. | Sept. 22 – Sept. 26, 2025
Shoulder work will take place on Enchanted Drive between Royal Drive and Missouri Avenue beginning Monday, September 22, 2025, through Friday, September 26, 2025. SA Connects will be installing underground infrastructure for Metronet Fiber as part of a utility permit. Access to businesses will be maintained throughout the construction, and RoadRUNNER Transit will not be affected. This work is taking place in City Council Districts 2 and 3.
Road Closure – Hickory Dr. | Sept. 22 – Oct. 3, 2025
Las Cruces motorists are advised that Hickory Drive will be closed to northbound traffic between Avenida de Mesilla and 1500 Hickory Drive beginning Monday, September 22, 2025, through Friday, October 3, 2025. The closure is necessary for 7B Development to install a new sewer main line. Access to businesses will be maintained; however, motorists should anticipate possible delays and are encouraged to seek alternate routes. Roadrunner Transit Route 4 will also be affected, with bus stop #6 at Walmart impacted during the project.
Shoulder Worl – Oro Viejo Rd., Warm Sand Ct., & Pinnacle View Dr. | Sept. 22 – Approx. Oct. 13, 2025
Las Cruces motorists are advised that Oro Viejo Rd., Warm Sands Ct. & Pinnacle View Dr. will experience shoulder work and possible lane closures starting as early as September 22, 2025. SA Connects will be installing new telecommunication infrastructure for Metronet. It is anticipated that the work will take three (3) weeks to complete.
Access to residences and businesses will be maintained and Roadruuner Transit will not be affected. This work is being done in Council District #3.
Street Work Notice – Fiber Line Installations | Sept 18, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Locust St & Anderson Dr (aerial – restoration)
- Wisconsin Ave & S Triviz Dr (underground)
- Cedardale Loop & Spitz St (underground)
- Oro Viejo Rd & Vista Primera Rd (underground)
- Mall Dr & S Telshor Blvd (underground)
- Don Roser Dr & Fairway Dr (underground)
- Elks Dr & Desert Candle Dr (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | Sept. 17, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Locust St & Anderson Dr (aerial – restoration)
- Wisconsin Ave & S Triviz Dr (underground)
- Cedardale Loop & Spitz St (underground)
- Loma Verde Ln & Vista Primera Rd (underground)
- Mall Dr & S Telshor Blvd (underground)
- John St & Bromilow St (aerial – restoration)
- Elks Dr & Desert Candle Dr (aerial)
- Don Roser Dr & Fairway Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closures – S. Triviz Dr. | Sept. 17 – Sept. 26, 2025
Las Cruces motorists are advised that intermittent lane closures will be in place on South Triviz Drive between Wisconsin Avenue and approximately 750 feet north of S. Triviz Drive beginning Wednesday, September 17, 2025, through Friday, September 26, 2025. Work will take place from 7 a.m. to 5 p.m., Monday through Friday, as part of a wire utility permit. Evenings and weekends will remain free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to anticipate delays, reduce speed near the work zone, and follow all posted signs. Roadrunner Transit Route 8 and nearby bus stops may be temporarily impacted during this work.
Shoulder Work – Copper Loop | Sept. 18 – Sept. 19, 2025
Las Cruces motorists are advised that shoulder work will take place on Copper Loop, between Brass Way and 1903 Copper Loop, beginning Thursday, September 18, 2025, through Friday, September 19, 2025. Stedywire will be completing the work as part of a wire utility permit. Access to residences and businesses will be maintained during the project, though Roadrunner Transit Route 5 may be impacted. This work is being completed in City Council District #4.
Street Work Notice – Fiber Line Installation | Sept. 16, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Locust St & Anderson Dr (aerial- equipment breakdown)
- Wisconsin Ave & S Triviz Dr (underground)
- Cedardale Loop & Spitz St (underground)
- Loma Verde Ln & Vista Primera Rd (underground)
- Mall Dr & S Telshor Blvd (underground)
- John St & Bromilow St (aerial)
- Valley View Ave & Winters St (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | Sept. 15, 2025
-
Locust St & Anderson Dr (aerial)
-
Wisonsin Ave & S Triviz Dr (underground)
-
Rouault Ave & Spitz St (underground)
-
Loma Verde Ln & Vista Primera Rd (underground)
-
Mall Dr & S Telshor Blvd (underground)
-
John St & Bromilow St (aerial)
Road Closure – N. Melendres St. | Sept. 15 – Dec. 30, 2025
Las Cruces Motorists will experience a road closure for N. Melendres St. The closure will take place between W. Hadley Ave. and W. Mountain Ave. starting September 15, 2025, through December 30, 2025, depending on weather conditions. The hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. A detour route will be provided to detour traffic through neighboring streets; we ask that you please follow the detour signage that will be installed.
A-Mountain Construction will be working on Phase 1 in the reconstruction of the N. Melendres St. Roadway Project; installation of storm drain inlets, pavement, curb and gutter, driveways, ADA ramps, sidewalks, street lighting, and utilities including water, sewer, and gas.
The road closure will not affect the Roadrunner Transit.
This work is being done in Council District # 4.
Intermittent Lane Closures – Solano Dr. | Sept 15 – Sept 19, 2025 & Sept 22 – Sept 23, 2025
Northbound commuters on Solano Drive between E. Court Ave. and Augustine Ave. will be subject to intermittent lane closures on the following dates:
- Monday, September 15, 2025, to Friday, September 19, 2025
- Monday, September 22, 2025, to Tuesday, September 23, 2025.
H & H Underground will be placing underground utilities as part of a wire utility permit.
The work will affect bus stop #23 on Roadrunner Transit Route 8. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 1.
Road Maintenance – Various Streets | Sept. 15 – Sept. 16, 2025
Streets Management will be applying chip seal surface treatment on various city streets beginning on Monday, September 15, 2025, through Tuesday, September 16, 2025, with expected completion in two (2) days. Residents and businesses will be notified 24 hours prior to work beginning.
Streets to be affected include:
- Espina St. from Hadley Ave. to Virginia St. Work will take place in City Council District # 1.
- Mountain Ave. from Solano Dr. to Tornillo St. Work will take place in City Council District # 1.
- Augustine Ave. from Solano Dr. from Manzanita St. Work will take place in City Council District # 1.
- Lucero Ave. from Almendra St. to Tornillo St. Work will take place in City Council District # 1.
For the public’s convenience, crews will work from 7 am to 6 pm, Monday, September 15, 2025, through Tuesday September 16, 2025, Access to residences and businesses will be maintained with periodic closures during the construction period. Motorists are urged to use caution through this area or use alternate routes.
Roadrunner Transit routes will not be affected. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
Lane Closure – Missouri Ave | Sept 15 – September 23, 2025
Las Cruces Motorists will experience a right lane closure on Missouri Ave between 2452 Missouri Ave. and S. Don Roser Dr. starting September 15 through September 23, 2025.
SA Connects will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #2 & 3. Access to residents will be maintained during the construction.
Street Work Notice – Fiber Line Installations | Sept. 11, 2025
-
California Ave & Pecos St (aerial)
-
Wisconsin Ave & S Triviz Dr (underground)
-
Roualt Dr & Spitz St (underground)
-
E Idaho Ave & Mall Dr (underground)
-
Loma Verde Ln & Vista Primera Rd (underground)
-
John St & S Triviz Dr (underground – equipment breakdown)
Lane Closures – W. Lohman Ave. | Sept. 11 – Sept. 12, 2025
Las Cruces Motorists will experience lane closures on W. Lohman Ave. between S. Water St. and S. Main St. starting September 11 through September 12, 2025. The right turn lane onto S. Main St. will be closed and the fair left lane will be closed.
H & H Underground will be installing underground infrastructure for UPN Fiber as part of a utility permit.
The lane closures will not affect the Roadrunner Transit. This work is being done in Council District #4. Access to business will be maintained during the construction.
Street Work Notice – Fiber Line Installations | Sept. 10, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- S Valley Dr & McClure Rd (aerial – maintenance)
- Wisconsin Ave & S Triviz Dr (underground)
- Roualt Ave & Spitz Rd (underground)
- Turner Ave & Lexnoc Ave (underground)
- E Idaho Ave & Mall Dr (underground – potholing)
- Loma Verde Ln & Vista Primera Rd (underground)
- John St & S Trivia Dr (underground – equipment breakdown)
- California Ave & Pecos St (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | Sept. 9, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- California Ave & Pecos St (aerial)
- Wisconsin Ave & S Triviz Dr (underground)
- Rouault Ave & Spruce Ave (underground)
- Turner Ave & Lenox Ave (underground)
- Neleigh Dr & Winton Dr (underground)
- Loma Verde Ln & Vista Primera Rd (underground)
- John St & S Triviz Dr (underground)
- Madrid Ave & Desert Dr (aerial – maintenance)
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work – S. Valley Dr. | Sept. 9 – Sept. 12, 2025
Las Cruces Motorists will experience shoulder work on S. Valley Drive from 590 S. Valley Drive to 650 S. Valley Drive. The shoulder work will be in place starting September 9 through September 12, 2025. Access to businesses will be maintained during the construction.
H&H Underground will be installing underground infrastructure for UPN Fiber.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #4.
Amador Avenue Traffic Work | Sept 10 – 11, 2025
Street Work Notice – Fiber Line Installations | Sept. 8, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- California Ave & Pecos St (aerial)
- Loma Verde Ln & Vista Primera Rd (underground)
- Rouault Ave & Creed Ave (underground)
- Sexton St & Spruce Ave (underground – restoration)
- Neleigh Dr & Santa Monica Dr (underground)
- Wisconsin Ave & S Locust St (underground)
- John St & S Triviz Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Maintenance – Multiple Streets | Sept. 8 – Sept. 12, 2025
Streets Management will be applying a chip seal surface treatment on multiple city streets beginning Monday, September 8, 2025, through Friday, September 12, 2025. Work will take place from 7 a.m. to 6 p.m. each day. Access to residences and businesses will be maintained throughout the project, though periodic closures may occur. Motorists are urged to use caution through work zones and consider alternate routes. Roadrunner Transit routes will not be affected. Residents and businesses will be notified 24 hours prior to work beginning.
Streets affected include:
-
Newcomb St. (Melendrez St. to Mesilla St.)
-
Pueblo St. (Newcomb St. to Parker Rd.)
-
Concord Ave. (Gladys Dr. to Stull Dr.)
-
Magnolia Ave. (Gladys Dr. to Stull Dr.)
-
Gladys Dr. (Missouri Ave. to Calle de Suenos)
-
Calle de Suenos (Gladys Dr. to Stull Dr.)
-
Buena Vida Cir. (Telshor Blvd. to Terrace Dr.)
-
Buena Vida Ct. (Telshor Blvd. to Cul-De-Sac)
-
Pebble Beach Rd. (Buena Vida Cir. to Buena Vida Cir.)
-
Pine Valley St. (Buena Vida Cir. to Pebble Beach Rd.)
-
Thunderbird St. (Pine Valley St. to Pebble Beach Rd.)
-
Hillsdale St. (Glendale Dr. to Devendale Dr.)
-
Cedardale Dr. (Devendale Dr. to Elks Dr.)
-
Bloomdale Dr. (Devendale Dr. to Elks Dr.)
-
Camino Del Rex (Legacy Dr.)
-
Camino Del Rex (Legacy Dr. to San Acacio St.)
-
Camino Del Rex (San Acacio St. to Valencia Dr.)
Shoulder Work – Foothills Rd | Sept. 8 – Sept. 12, 2025
Las Cruces motorists are advised that shoulder work will take place on Foothills Road between Lohman Avenue and Roadrunner Parkway starting Monday, September 8, 2025, through Friday, September 12, 2025.
A&J Drilling will be installing underground utilities in the area. Access to all residences and businesses will be maintained throughout the project, and Roadrunner Transit routes will not be affected. Motorists are urged to follow all posted signs and drive cautiously through the work zone.
Lane Closure and Shoulder Work – S Valley Dr | Sept. 8 – Sept. 19, 2025
Las Cruces motorists are advised that South Valley Drive will experience a right turn lane closure on Monday, September 8, 2025, for one day. This closure will occur between Enterprise, 1340 S. Valley Drive, and Hickory Drive to allow J & E Utilities Service LLC to install a new water main underground by drilling beneath the roadway, minimizing disruption to traffic.
In addition to the one-day lane closure, shoulder work will take place at two locations on South Valley Drive from September 8 through September 19, 2025. The locations include S. Valley Drive between Enterprise, 1340 S. Valley Drive, and Hickory Drive, and S. Valley Drive between Rigsby Road and Mountain View, 1455 S. Valley Drive.
Access to all residences and businesses will be maintained throughout the project. Motorists are encouraged to follow all posted signs, anticipate possible delays, and consider alternate routes. Roadrunner Transit service will not be affected during this work. This work is being done in Council District #4
This work is being done in Council District #4.
Road Closure – El Camino Real | Sept. 8 – Sept. 12, 2025
Utility potholing will take place on El Camino Real between Spitz Street and Darden Road beginning at 6:30 a.m. Monday, September 8, 2025, through 5 p.m. Friday, September 12, 2025.
Signal Repair at Motel Boulevard and Tashiro Drive |
Signal Repair at Motel Boulevard and Tashiro Drive
The signal at the intersection of Motel Boulevard and Tashiro Drive is undergoing work that began on Monday, August 25, 2025.
There will be intermittent lane closures that will take place during the project that is expected to last for approximately 4 weeks until September 19, 2025.
Access to residences and businesses will be maintained during the construction. Motorists are urged to follow all posted signs and seek alternative routes to avoid possible delays. The work and lane closures will not affect Roadrunner Transit.
RT Electric is performing the signal repair work at this location.
Street Work Notice – Fiber Line Installations | Sept. 3, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Devendale Ave & Bloomdale Dr (aerial)
- Nogal Canyon Dr & Canyon Ridge Arc (underground)
- Cedardale Loop & Creed Ave (underground)
- Cedardale Loop & Spitz St (underground)
- Winton Cir & Santa Monica Dr (underground)
- Wisconsin Ave & S Locust St (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
John Street Shoulder Work | Sept. 5-12, 2025
John Street (Payne Street to Triviz Drive)
Shoulder work will be in place on John Street between Payne St. and Triviz Dr. on Friday, September 5, 2025, and lasting through Friday, September 12, 2025.
AECON Utilities will be placing underground wire infrastructure.
Roadrunner Transit Routes will not be affected by the shoulder work. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
Street Work Notice – Fiber Line Installations | Sept. 2, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- California Ave & Pecos St (aerial)
- Nogal Canyon Dr & Canyon Ridge Arc (underground)
- Cedardale Loop & Creed Ave (underground)
- Cedardale Loop & Spitz St (underground)
- El Camino Real & Spitz St (underground)
- McClure Rd & Santa Monica Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Lane Closure – Bataan Memorial East | September 2, 2025 (Approx. 3 weeks)
Las Cruces motorists are advised that Bataan Memorial East at the intersection with Rinconada Boulevard will have a lane closure beginning Tuesday, September 2, 2025. The closure will last for approximately 3 weeks in duration.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs. The work and lane closure will not affect RoadRUNNER Transit or transit stops.
Smith and Aguirre Construction Company Inc. will be completing roadway work at this location. This work will be done in City Council District 3 and 6.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closure – E. Lohman Ave. | Sept. 2 – Sept. 5, 2025
There will be intermittent lane closures on E. Lohman Avenue, between the I-25 exit ramp and the intersection of Walton Boulevard and Lohman Avenue, beginning Tuesday, September 2, 2025, through Friday, September 5, 2025.
The closures are required as H&H Underground completes work under a wire utility permit. Both eastbound and westbound lanes will be affected at different times throughout the project.
Motorists are encouraged to allow extra travel time, follow posted signage, and expect possible delays in the area.
While Roadrunner Transit Routes 6, 7, and 8 may experience temporary impacts, access to surrounding businesses and residences will be maintained.
This work is taking place in City Council District 3.
Street Work Notice – Fiber Line Installations | Aug. 29, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Don Roser Dr & Missouri Ave (aerial)
- Pinedale Ave & Mondale Loop (aerial)
- Cedardale Loop & Spitz St (underground)
- Scotland Crt & Bentley Dr ( underground)
- Wisconsin Ave & S Locust St (underground)
- Winton Cir & Santa Monica Dr (underground)
- Nogal Canyon Dr & Canyon Ridge Arc (underground)
- S Telshor Blvd & E Idaho Ave (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | Aug. 28, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Devendale Ave & Bloomdale Dr (aerial)
- Cedardale Loop & Spitz St (underground)
- Scotland Crt & Bentley Dr (underground)
- Wisconsin Ave & S Locust St (underground)
- Winton Cir & Santa Monica Dr (underground)
- Nogal Canyon Dr & Canyon Ridge Arc (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work Closure – Wisconsin Ave | Aug. 28 – Sept. 12, 2025
As part of a wire utility permit the following streets will be impacted by shoulder work closures beginning Thursday August 28, 2025, through approximately Friday September 12, 2025.
The streets include:
- Wisconsin Avenue between S. Locust Street to S. Triviz Drive. This project is in City Council District 2.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes 8 and bus stops may be affected.
Road Closure – Sonoma Ranch Blvd. | Aug. 27 – Sept 19, 2025
A road closure will be taking place along Sonoma Ranch Blvd between Peachtree Hills Rd. to Arroyo Rd. This work is expected to begin Wednesday August 27, 2025, through Friday September 19, 2025.
Caliper Construction will be doing the work as part of Metro Verde North Ph.1 Subdivision.
The road closure work will not impact the Roadrunner Transit routes. This work is being done in Council District #5.
Street Work Notice – Fiber Line Installations | Aug. 25, 2025
Street Work Notice – August 25, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- High St & Imperial Ridge (aerial)
- Jasmine Dr & Ivydale Dr (aerial)
- Rouault Ave & Spitz St (underground)
- Cedardale Loop & Spitz St (underground)
- Sctoland Crt & Bentley Dr (underground)
- Jordan Rd & Monte Vista Ave (underground)
- Freedom Dr & Friendship Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Closure – Cortez Dr | Aug 25, 2025 (Approx. 2 weeks)
Las Cruces motorists are advised that Dunn Drive will be experiencing a road closure from Reynolds Drive to Aldrich Road on Monday August 25, 2025, Caliper Construction will be doing work as part of the City of Las Cruces East Mesa Roads and Drainage. The road closure will last approximately two (2) days. Detours and signage will be present directing traffic around the work zone.
Motorists wishing to avoid possible delays are encouraged to seek alternative routes. Roadrunner Transit routes will not be affected.
This work is being done in Council District #6.
Intersection Construction – Avenida de Mesilla/Hickory Dr. | Ongoing with completion in 2 weeks
Las Cruces motorists are advised that southbound Hickory Drive, south of Avenida de Mesilla, has been re-opened to traffic and northbound Hickory Drive is temporarily closed. It is anticipated that Renegade Construction, as part of a new private development, will have the roadway improvements completed within two (2) weeks.
Access to businesses will be maintained. Roadrunner Transit route 4, stop 6 and 28 will be affected. This work is being done in Council District #4.
Street Work Notice – Fiber Line Installations | Aug. 21, 2025
-
High St & Imperial Ridge (aerial)
-
Bloomdale Dr & Elks Dr (aerial)
-
Rouault Ave & Spitz St (underground)
-
Cedardale Loop & Spitz St (underground)
-
Sctoland Crt & Bentley Dr (underground)
-
Nogal Canyon Rd & Stone Canyon Pt (underground)
-
Winton Cir & Flora Vista Dr (underground)
Shoulder Work Closure – Jordan Rd & Monte Vista Ave | Aug. 25 – Aug. 29, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning Monday August 25, 2025, through approximately Friday August 29, 2025.
The street include:
- Jordan Road between University Ave. to Monte Vista Ave. This project is in City Council District 2.
- Monte Vista Ave. between Locust St. to Solano Dr. This project is in City Council District 2.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes 2 and 8 or bus stops may be affected.
Intermittent Lane Closures – Locust St. | Aug. 22, 2025
As part of wire utility permit the intersection of Locust Street and University will be impacted by intermittent lane closures on Friday August 22, 2025. This project is in City Council District 2.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes 2 and 8 or bus stops may be impacted.
Street Work Notice – Fiber Line Installations | Aug. 20, 2025
Street Work Notice – August 20, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Enchanted Dr & Missouri Ave (aerial)
- Jasmine Dr & Elks Dr (aerial)
- Rouault Ave & Spitz St (underground)
- Cedardale Loop & Spitz St (underground)
- Sctoland Crt & Bentley Dr (underground)
- Kent Rd & Wyoming Ave (underground)
- Winton Cir & Flora Vista Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Street Work Notice – Fiber Line Installations | Aug. 19, 2025
Street Work Notice – August 19, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Enchanted Dr & Missouri Ave (aerial)
- Bloomdale Dr & Elks Dr (aerial)
- Rouault Ave & Spitz St (underground)
- Kent Rd & Wyoming Ave (underground)
- Winton Cir & Flora Vista Dr (underground)
- Paseo de Onate & Canyon Ridge Arc (underground)
- Benz Dr & Bentley Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Road Closure – Cortez Dr. | Aug. 19 – Approx. Sept. 2, 2025
Las Cruces motorists are advised that Dunn Drive will be experiencing a roadclosure from Reynolds Drive to Aldrich Road continuing Tuesday August 19, 2025. Caliper Construction will be doing work as part of the City of Las Cruces East Mesa Roads and Drainage. For the public’s convenience, crews will only work from 7 a.m. to 6 p.m. Monday to Friday, leaving evenings and weekends free of construction activity.
The road closure will last approximately two (2) weeks. Detours and signage will be present directing traffic around the work zone.
Motorists wishing to avoid possible delays are encouraged to seek alternative routes. Roadrunner Transit Route routes will not be affected.
This work is being done in Council District #6.
Shoulder Work Closure – Kent Rd | Aug. 19 – Aug. 22, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning Tuesday August 19, 2025, through approximately Friday August 22, 2025.
The street include:
- Kent Road between Wyoming Ave to Monte Vista Ave.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops will not be affected. This project is in City Council District 2.
Street Work Notice – Fiber Line Installations | Aug. 18, 2025
-
Review Dr & Mesa Dr (aerial)
-
Jana Ct & Cedardale Dr (underground)
-
Winton Cir & McClure Rd (underground)
-
Devndale Ave & Elks Dr (aerial)
-
Cedardale Dr & Spitz Ave (underground)
-
Paseo de Onate & Canyon Ridge Arc (underground)
-
Benz Dr & Bentley Dr (underground)
Lane Closure – N. Telshor Blvd. & Del Rey Blvd. | Aug. 20 – Aug. 25, 2025
There will be a lane closure in effect Wednesday, August.20th, 2025, at the intersection of N. Telshor Blvd and Del Rey Blvd. Eastbound and westbound traffic will be shifted into eastbound lanes, the closure will be in effect for the entire duration of the project. This project is expected to be completed on August 25th, 2025.
Valley Concrete LLP will be removing delineators and replace them with a concrete dividing curb.
This work is to be done in Council District #3. Roadrunner Transit routes will not be affected. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
Shoulder Work – Rinconada Blvd | Aug. 15 – Aug. 21, 2025
Las Cruces Motorists will experience shoulder work on Rinconada Blvd 240-ft north of the Bataan Memorial West intersection starting August 15, 2025, through August 21.
Kelly Cable will be installing underground infrastructure for Lumens as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit. This work is being done in Council District #5. Access to residents will be maintained during the construction.
Street Work Notice – Fiber Line Installations | Aug. 15, 2025
-
Central Rd and Mesa Dr (aerial)
-
View Dr and Fairway Dr (aerial)
-
Jana Ct and Cedardale Dr (underground)
-
Cedardale Dr and Spitz Ave (underground)
-
Paseo Azul and Canyon Point Rd (underground)
-
Benz Dr and Bentley Dr (underground)
Water Outage Notice – Triviz Drive (Between Fairfax and Mulberry Avenues) | August 15 – 19, 2025
The waterline on Triviz Drive, between Fairfax Ave. and Mulberry Ave. will be shut down starting Friday, August 15, 2025. This work may run through Tuesday, August 19, 2025.
Morrow Enterprises, Inc., will be performing a water tie-in as part of a Capital Improvement Project. Residents and businesses will not be affected by the water outage.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, the City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182
Street Work Notice – Fiber Line Installations | Aug. 14, 2025
Street Work Notice – August 14, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Skylar Ln and Mesa Dr (aerial)
- Terreon Rd and Media Rd (aerial)
- View Dr and Fairway Dr (aerial)
- Jana Ct and Cedardale Dr (underground)
- De Vendale Ave and Lenox Ave (aerial)
- Cedardale Dr and Spitz Ave (underground)
- Pinnacle View Dr and Oro Viejo Rd (underground)
- Winton Cir and Flora Vista Dr (underground)
- Benz Dr and Bentley Dr
Please use caution when traveling through these areas and watch for crews and posted signage.
Shoulder Work – Rinconada Blvd. | August 15-21, 2025.
Rinconada Boulevard will have shoulder work 240-ft north of the Bataan Memorial West intersection starting August 15, 2025 and continuing through August 21.
Kelly Cable will be installing underground infrastructure for Lumens as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #5. Access to residents will be maintained during the construction.
Street Work Notice – Fiber Line Installations | Aug. 12, 2025
-
Bentley Dr and Bugatti Dr (aerial)
-
Lori Dr and Cedardale Loop (underground)
-
Pomona Dr and Fairway Dr (aerial)
-
Pendale Loop and Pineapple Dr (aerial)
-
Cedardale Dr and Jennifer St (underground)
-
Nogal Canyon Rd and Canyon Point Rd (underground)
-
Fischer Rd and Valley Dr (underground)
-
Winton Cir and Flora Vista Dr (underground)
-
Benz Dr and Bentley Dr (underground)
Lane Closure – Canyon Ridge Arc | August 12, 2025 (Approx. 2 weeks)
Las Cruces motorists are advised that Canyon Ridge Arc will experience temporary lane closures and shoulder work starting as early as August 12, 2025. Metronet will be installing new private telecommunication infrastructure. It is anticipated that the work will take two (2) weeks to complete.
Access to residences and businesses will be maintained and Roadrunner Transit will not be affected. This work is being done in Council District #3.
Street Work Notice – Fiber Line Installations | Aug. 11, 2025
Street Work Notice – August 11, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- N Main St and Spitz St (aerial)
- Suzanne Ave and Cedardale Loop (underground)
- Pomona Dr and Fairway Dr (aerial)
- Pendale Loop and Pineapple Dr (aerial)
- Spitz St and Rena Mae Ct (underground)
- Nogal Canyon Rd and Canyon Point Rd (underground)
- Fischer Rd and Valley Dr (underground)
- Benz Dr and Bentley Dr (underground)
- Lavender Dr and Elks Dr (aerial)
Please use caution when traveling through these areas and watch for crews and posted signage.
Intermittent Lane Closures – Roadrunner Pkwy. | Aug. 11 – Aug. 12, 2025
Southbound commuters on Roadrunner Pkwy. Between Camino Coyote and Lohman Ave. will experience intermittent lane closures on Monday, August 11, 2025, and Tuesday, August 12, 2025.
H & H Underground will be placing underground utilities in the vicinity as part of a wire utility permit.
The work will be on Roadrunner Transit Route 3 but will not affect any bus stop locations. Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs.
This work will be done in City Council District 3.
Road Maintenance – Various Streets | *POSTPONED*
UPDATE: Due to unforeseen circumstances the chip seal project has been postponed to a later date.
Streets Management will be applying a chip seal surface treatment on various city streets beginning on Monday, August 11, 2025, through Thursday, August 14, 2025, with an expected completion in four (4) days. Residents and businesses will be notified 24 hours prior to work beginning.
Streets to be affected include:
- North Park Dr. from Yale Dr. to Yale Dr. Work will take place in City Council District #2
- Old Farm Rd: from North Park Dr. to North Park Dr. Work will take place in City Council District # 2
- Concord Ave: from Gladys Dr. to Stull Dr. Work will take place in City Council District # 3
- Magnolia Ave: from Gladys Dr. To Stull Dr. Work will take place in City Council District # 3
- Gladys Dr. from Missouri Ave. to Calle de Suenos, Work will take place in City Council District # 3
- Calle de Suenos from Gladys Dr. to Stull Dr. Work will take place in City Council District # 3
- Lees Dr. from Idaho Ave. to Montana Ave. Work will take place in City Council District # 3
- Buena Vida Cir. From Telshor Blvd. to Terrace Dr. Work will take place in City Council District # 2
- Buena Vida Ct. from Telshor Blvd to Cul-De Sac, Work will take place in City Council District # 2
- Pebble Beach Rd. from Buena Vida Cir. To Buena Vida Cir. Work will take place in City Council District # 2
- Pine Valley St. from Buena Vida Cir to Pebble Beach Rd. Work will take place in City Council District # 2
- Thunderbird St. from Pine Valley St. to Pebble Beach Rd. Work will take place in City Council District # 2
For the public’s convenience, crews will work from 7 a.m. to 6 p.m., Monday, August 11, 2025, through Thursday, August 14, 2025. Access to residences and businesses will be maintained with periodic closures during the construction period. Motorists are urged to use caution through this area or use alternate routes.
Roadrunner Transit routes will not be affected. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
Walking Path Closure – Triviz Ave. | Aug. 11 – Aug. 13, 2025
The walking path on Triviz Drive between Fairfax Dr. and Mulberry Ave. is scheduled to be closed Monday, August 11, 2025, through Wednesday, August 13, 2025. Commuters are urged to follow all posted signs.
Morrow Enterprises, Inc., will be completing roadway work on the walking path during this closure. This work will be done in City Council District 1.
Street Work Notice – Fiber Line Installations | Aug. 7, 2025
-
Valley View Ave & Lavander Dr (aerial)
-
Suzanne Ave & Cedardale Dr (underground)
-
Oban Ct & Via De Ville (underground)
-
Elks Dr and Lennox Ave (aerial)
-
Spitz St and Rena Mae Ct (underground)
-
Nogal Canyon Rd and Canyon Point Rd (underground)
-
Harris Rd and Mayfield Ln (underground)
-
Benz Dr & Bentley Dr (underground)
-
Lavander Dr & Elks Dr (aerial)
Street Work Notice – Fiber Line Installations | Aug. 6, 2025
-
Del Rey Blvd and Mars Ave (aerial)
-
Spitz St and Tonja Ct (underground)
-
Aguilera Ct and El Camino Real (underground)
-
Elks Dr and Lennox Ave (aerial)
-
Spitz St and Rena Mae Ct (underground)
-
Nogal Canyon Rd and Canyon Point Rd (underground)
-
Harris Rd and Mayfield Ln (underground)
-
Benton Ave and Bugatti Dr (underground)
Water Outage – Cortez Dr. | Aug. 7, 2025
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Thursday August 7, 2025. The areas that may be impacted are listed below.
- Intersection of Cortez Drive and Lilla Road to intersection of Lilla Road to Columbus Drive
- Intersection of Cortez Drive and Churchill Avenue to intersection of Columbus Drive to Churchill Avenue
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575-526-0500 for assistance. This work is being done in Council District No.6.
Street Work Notice – Fiber Line Installations | August 5, 2025
Street Work Notice – August 5, 2025
Metronet/Vexus crews are continuing the installation of underground and aerial fiber lines in neighborhoods across Las Cruces.
Today’s work includes the following areas:
- Huntington Dr and Pebble Beach Rd (aerial)
- Suzanne Ave and Cedardale Dr (underground)
- Tularosa Dr and Dalrymple Rd (underground)
- Los Amigos Ct and Claude Dove Dr (aerial)
- Newton Dr and Boise Dr (aerial)
- Rouault Ave and Cory Dr (underground)
- Nogal Canyon Rd and Canyon Point Rd (underground)
- Harris Rd and Mayfield Ln (underground)
- Benton Ave and Bugatti Dr (underground)
Please use caution when traveling through these areas and watch for crews and posted signage.
Water Outage – Cortez Dr | Aug. 16, 2025
Water Outage on Cortez Drive
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Wednesday August 6, 2025. The areas that may be impacted are listed below.
- Intersection of Cortez Drive and Hacienda Avenue to intersection of Hacienda Avenue to Columbus Drive
- Intersection of Cortez Drive and Davis Road to the intersection of Davis Road to Jefferson Lane
- Intersection of Davis Road and Reyna Court to end of Reyna Court
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575-526-0500 for assistance. This work is being done in Council District 6.
Street Work Notice – Fiber Line Installations | August 1, 2025
-
Huntington Dr and Pebble Beach Rd (aerial)
-
Suzanne Ave and Spitz St (underground)
-
Efrain Ln and Dalrymple Rd (underground)
- Cederdale Loop and Spitz St (underground)
-
Canyon Verde and Canyon Point Rd (underground)
-
Santa Monica and Winton Rd (underground)
-
Benton Ave and Bugatti Dr (underground)
Full Road Closure Triviz Drive at Madrid Intersection | Aug. 4 -Sept. 4, 2025
The City of Las Cruces will close Triviz Drive at the intersection of Madrid Avenue for up to four weeks beginning Monday, August 4, 2025 to aid in the Madrid Avenue Extension reconstruction project. This closure will have several detours in place for those traveling on Triviz Drive and for those personnel conducting the work. Detour signage will be in place on Main Street, Triviz Drive, Solano Drive, Spruce Avenue, and Madrid Avenue.
The Madrid Avenue Extension reconstruction project includes the installation of a 14-inch water main at a depth of eight feet through the intersection. This work will also include the removal and disposal of existing asphalt, installation of the new water main, reworking the roadway base layers, new curb and gutter for transitions, and a new pavement section.
The full closure will allow these improvements to be completed with a reduced inconvenience to the public. Alternating lane closures would potentially add an additional four weeks to the project.
Roadrunner Transit will have an alternate route because of this closure.
UPDATE: Water Outage – Cortez Dr. | August 5, 2025
This has been updated from the July 31 notice.
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Tuesday August 5, 2025. The areas that may be impacted are listed below.
– Intersection of Cortez Drive and Stagecoach Lane to intersection of Aztec Dr. to Stagecoach Lane
– Intersection of Cortez Drive and Carter Drive to the intersection of Carter Drive to Shannon Rd.
– Intersection of Carter Drive and Shannon Rd. to end of Carter Drive
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182. This work is being done in Council District No.6.
Water Outage – Cortez Dr. | July 30, 2025
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Wednesday July 30, 2025. The areas that may be impacted are listed below.
- Intersection of Cortez Drive and Stagecoach Lane
- Intersection of Cortez Drive and Carter Drive
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. This work is being done in Council District No.6.
Lane Closure – University Ave. | July 28 – July 30, 2025
Commuters on University Avenue between Turrentine Drive and Knox St. will experience intermittent lane closures on Monday, July 28, 2025, and will last through Wednesday, July 30, 2025.
H & H Underground will be placing underground utilities as part of a wire utility permit.
The work will affect bus stop #19 on Roadrunner Transit Route 4. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 2.
Shoulder Work – Benz Dr., Bugatti Dr., Benton Ave. & Bearcat Dr. | July 30 – Aug. 15, 2025
Las Cruces Motorists will experience shoulder work on the following streets Benz Dr, Bugatti Dr, Benton Ave & Bearcat Dr Shoulder Work starting July 30 through August 15, 2025.
SA Connects will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Road Closure – Triviz Dr. | Aug. 4, 2025 (Approx. 1 month)
Triviz Drive is scheduled to be closed for approximately one month, beginning August 4, 2025, between Fairfax Avenue and Mulberry Avenue. A detour route will be in place to guide traffic around the construction zone.
The road closure affects bus stops 9 through 14 on Roadrunner Transit Route 1.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs.
Morrow Enterprises, Inc., will be completing utility and roadway work on Triviz Drive. This work will be done in City Council District 1.
Street Work Notice – Fiber Line Installations | July 22, 2025
Crews working on behalf of Metronet and Vexus Fiber are installing underground and aerial fiber lines in various neighborhoods as part of a privately led effort to expand access to high-speed internet in Las Cruces.
Today’s work includes areas near:
-
Roadrunner Cir & Hillrise Dr (aerial)
-
Cedardale Loop & Lori Dr (underground)
-
Pradera Dorada Arc & Aguilera Ct (underground)
-
Newton St & Boise Dr (aerial)
-
Hillrise Dr & Crestview Dr (aerial)
-
Nogal Canyon Rd & Stone Canyon Dr (underground)
-
Lori Dr & Jennifer St (underground)
-
Peri Ann Dr & E Mulberry Ave (underground)
Please use caution when traveling through these areas and watch for crews and signage.
Lane Closure – Sonoma Ranch Blvd. | July 23 & July 24, 2025
Northbound commuters on Sonoma Ranch Blvd. between Lohman Ave. and Camino Lindo will experience a lane closure on Wednesday, July 23, 2025, and Thursday, July 24,2025.
H&H Underground will be installing underground utilities as part of a wire utility permit.
The work will be on Roadrunner Transit Route 2 but will not affect any bus stop locations. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 6.
Road Closure – Triviz Drive Road | July 28, 2025
Triviz Drive is scheduled to be closed for approximately one month, tentatively beginning July 28, 2025, between Fairfax Avenue and Mulberry Avenue. A detour route will be in place to guide traffic around the construction zone.
The road closure affects bus stops 9 through14 on Roadrunner Transit Route 1.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs.
Morrow Enterprises, Inc., will be completing utility and roadway work on Triviz Drive. This work will be done in City Council District 1.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work – Divot Avenue | July 16 – 17, 2025
Shoulder work will take place along Divot Avenue between the intersection of Walton Blvd. and Divot Ave. to approximately 500 ft heading West on Divot Avenue from Wednesday July 16 to Thursday July 17, 2025.
H&H Underground will be doing the work as part of a wire utility permit.
The shoulder work may impact the RoadRUNNER Transit routes 6 and 7.
Water Outage – Avenida Blanco from Valley Dr. to Calle del Sol | July 15, 2025
Residents and businesses within the following limits will experience a water outage from 9 a.m. until 1 p.m., Tuesday, July 15, 2025. The areas that will be impacted are as listed below.
The water outage will enable Spartan Construction of NM, LLC. to complete the water line tie-ins as part of the Casa Linda Acres Reconstruction CIP.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575-526-0500 for assistance. This work is being done in Council District No.6.
Intermittent Lane Closures – Del Rey Boulevard | July 14, 2025
Southbound commuters on Del Rey Boulevard (between Bataan Memorial W. and Northrise Dr.) will have intermittent lane closures starting Monday, July 14, 2025, and lasting approximately two weeks.
DuCross Construction, LLC. will be installing new utilities as part of a commercial building permit.
The work will affect bus stop #29 on Roadrunner Transit Route 1. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 3.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Temporary Four-Way Stop at Avenida de Mesilla and Hickory Drive
A roadway modification project will temporarily cause traffic signals at Avenida de Mesilla and Hickory Drive to be out of service and the intersection to be converted to a four-way stop.
Work on the project begins Monday, July 14, 2025, and is anticipated to last about two weeks. Renegade Construction will be making modifications to Hickory Drive and the traffic signal.
Drivers are encouraged to exercise caution and respect other drivers while navigating through the intersection.
Access to residences and businesses will be maintained. The roadwork will affect Roadrunner Transit Rout 4, Stop 6 and 28.
Shoulder Work – Chitamacha Road | July 14-18, 2025
Shoulder work will take place on Chitamacha Road (between El Camino Real Road and Eagle Feather Place) from July 14-18, 2025.
AECON Utilities will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect Roadrunner Transit.
Intermittent Lane Closure – Spruce Ave. | July 14 – July 21, 2025
Las Cruces motorists please be advised that Fiber Optic Installation will take place on Spruce Avenue and will experience intermittent lane closure for eastbound traffic from N. Walnut St. to N. Triviz Dr. Work. Installation will begin on July 14, 2025, and is expected to be completed by July 21, 2025.
Access to residences and businesses will be maintained and Roadrunner Transit will not be affected. This work is being done in Council District 2 and 4.
Emergency Lane Closure at Del Rey Boulevard and Mars Avenue
Motorists who frequent Del Rey Boulevard will notice a temporary lane closure Thursday, July 10, at the intersection of Mars Avenue.
The lane closure is to allow H and H Underground to repair UPN fiber that was damaged.
The temporary lane closure is anticipated to last most of Thursday.
The lane closure will not affect Roadrunner Transit. Access to businesses and residences will be maintained throughout the project.
Shoulder Work – S. Valley Dr. | July 10 – July 16, 2025
Las Cruces Motorists will experience shoulder work on S. Valley drive between 650 S. Valley Drive and Sequoia Ave. starting July 10 through July 16, 2025.
H & H Underground will be installing underground infrastructure for UPN Fiber as part of a utility permit.
The shoulder work will affect the Roadrunner Transit Route 4 bus stop 4. This work is being done in Council District #4. Access to residents will be maintained during the construction.
Intermittent Lane Closures – Northbound Lane of Telshor Blvd. | July 10, 2025
There will be intermittent lane closures on Thursday, July 10, 2025, on Northbound Telshor Blvd. from Commerce Dr. to Del Rey Blvd. The project is expected to be completed in one day. Detours will be in place. Please follow the signage.
City Road Construction crew will be doing street maintenance on the roadway.
Cortez Drive Improvements | July 8 – Aug. 8, 2025
Cortez Drive Improvements (Between Porter Drive to Dunn Drive)
Dunn Drive will experience a road closure from Reynolds Drive to Aldrich Road continuing Tuesday July 8, 2025.
Caliper Construction will do work as part of the City of Las Cruces East Mesa Roads and Drainage. During construction, access to Dunn Drive will not be permitted to through traffic. The road closure will last approximately one month. Detours and signage will be present directing traffic around the work zone.
Motorists wishing to avoid possible delays are encouraged to seek alternative routes. Roadrunner Transit Route routes will not be affected.
Shoulder Work: Lori Drive and Jennifer Street | July 8 – 11, 2025
Shoulder work will take place July 8 – 11, 2025 for:
Lori Drive: Between Cedardale Loop to Spitz Avenue
Jennifer Street: Between Lori Drive to Cedardale Loop
ARE Telecommunications LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will NOT affect Roadrunner Transit. Access to residences will be maintained during the construction.
Casa Linda Water Outage Notice | July 9, 2025
Residents and businesses within the following limits will experience a water outage from 9 a.m. until 1 p.m., Wednesday July 9, 2025.
The areas that will be impacted are as listed below.
– Avenida Blanco from Valley Drive to Calle del Encanto
– Calle del Sol from West Brown Road to Avenida de Mesilla
– Calle del Encanto from West Brown Road to Avenida de Mesilla
The water outage will enable Spartan Construction of NM, LLC. to complete the water line tie-ins as part of the Casa Linda Acres Reconstruction CIP.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182. This work is being done in Council District No.6.
Lane Shift Peachtree Hills Road | July 8 – August 8, 2025
A lane shift will be in place on Peachtree Hills Road between Jornada St. and Tapadero St. starting Tuesday, July 8, 2025, and will last approximately one month. Two-way traffic on Peachtree Hills Rd. will be maintained at all times.
Renegade Construction, LLC will be placing a sanitary sewer main as part of a commercial building permit.
Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops will not be affected.
Shoulder Work – Rock Canyon Loop | July 7, 2025 (Approx. 2 weeks)
Las Cruces motorists are advised that Rock Canyon Loop will experience shoulder workand possible lane closures starting as early as July 7, 2025. Metronet will be installing new private telecommunication infrastructure. It is anticipated that the work will take two (2) weeks to complete.
Access to residences and businesses will be maintained and Roadrunner Transit will not be affected. This work is being done in Council District #3.
Shoulder Work – Cedardale Loop & Spitz Ave. | July 7 – July 11, 2025
Las Cruces Motorists will experience shoulder work starting July 7, 2025, through July11.
The areas affected are:
- Cedardale Loop: Between Spitz Ave to Lori Dr
- Spitz Ave: Between Rouault to Tonja Ct
ARE Telecommunications LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Road Closure – N. Main St. | July 7 – July 9, 2025
Las Cruces motorists are advised that N Main Street from E. Las Cruces Ave. to W. Griggs Ave will be closed beginning Monday July 7, 2025, through Wednesday July 9, 2025.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs. The work and closure will not affect Roadrunner Transit or transit stops.
This work will be done in City Council District 1.
Palomas Avenue Shoulder Work | July 7-9, 2025
Shoulder Work Planned for Portion of Palomas Avenue
H & H Underground will be working on a wire utility permit July 7-9, 2025, that will temporarily block the shoulder along Palomas Avenue between the intersection of Del Monte Street and south Willow Street.
The shoulder work will not impact the Roadrunner Transit routes.
For more information, contact the Public Works Department, Construction Management section at (575) 528-3098.
Intermittent Lane Closures – N. Mesquite St. | July 1, 2025 (Approx. 2 weeks)
Las Cruces motorists are advised that N East Mesquite Street will be experiencing intermittent lane closures from the intersection of N Solano Drive and N Mesquite St. and from Solano Dr. to E. Madrid Ave. proceeding Tuesday July 1, 2025. G. Sandoval Construction will be doing work as part of the City of Las Cruces City Bond Median Landscape Ph.2 project. The intermittent lane closure will last approximately (2) two weeks. Detours and signage will be present directing traffic around the work zone.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Route 8 may be affected.
This work is being done in Council District #1.
Shoulder Work – Parker Rd. | July 2 – July 11, 2025
Las Cruces Motorists will experience shoulder work on Parker Rd. between N. Melendres St. and Alameda Blvd. and crossing Alameda Blvd to W. Greening Ave. for 150-ft. starting July 2, 2025, through July 11.
SA Connects will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit.
This work is being done in Council District #4.
Access to residents will be maintained during the construction.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Water Outage – Cortez Dr. | June 30 from 9am-1pm
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Monday June 30, 2025. The areas that may be impacted are listed below.
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance.
This work is being done in Council District No.6.
Water Outage – Cortez Dr. | July 1 from 9am-1pm
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Tuesday July 1, 2025. The areas that may be impacted are listed below.
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance.
This work is being done in Council District No.6.
Shoulder Work – Turner Ave. | June 26 – July 3, 2025
Las Cruces Motorists will experience shoulder work on Turner Avenue between Spitz St. and Johnson St. and on Spitz St. between Cielo Vista Ct. and Turner Ave. starting June 26 through July 3, 2025.
ARE Telecommunications LLC will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Shoulder Work – Claude Dove | June 24 – July, 2025
Las Cruces Motorists will experience shoulder work on Claude Dove Drive from Telshor Blvd. to Dalano Drive, on Dalano Drive from Claude Dove Drive to Crestview Drive, and Crestview Drive from Dalano Drive to Don Roser Drive. The shoulder work will be in place starting June 24, 2025 through July 3, 2025. Access to residents will be maintained during the construction.
H&H Underground will be installing underground infrastructure for UPN Fiber.
The lane closure will not affect the Roadrunner Transit. This work is being done in Council District 2 and 3.
Road Closure – Colorado Ave. | June 24 – July 1, 2025
Las Cruces motorists are advised that Colorado Avenue from Del Monte Street to Baca Road will be closed beginning Tuesday June 24, 2025, through Tuesday July 1, 2025.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs. The work and closure will not affect Roadrunner Transit or transit stops.
Crosstown Construction will be doing the work as part of a utility permit. This work will be done in City Council District 3.
Lane Closure – S. Locust St. | June 24 (Est. 2 Days)
Las Cruces Motorists will experience a lane closure for S. Locust Street between E. University Avenue and Wisconsin Avenue starting June 24, 2025, for two days. A drop lane for north bound traffic will be available.
Next Generation Contracting Inc. will be patching the roadway.
The lane closure will not affect the Roadrunner Transit.
Shoulder Work – Spitz Ave. | June 20 – June 27, 2025
Las Cruces Motorists will experience shoulder work on Spitz Avenue between Creed Ave. and Cedardale Dr. starting June 20, 2025, through June 27.
ARE Telecommunications LLC will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Triviz Drive Intermittent Road Closure | June 18, 12025
Intermittent Road Closure Along Triviz Drive
A portion of Triviz Drive, between Entrada del Sol and Hadley Avenue, will experience temporary, intermittent closures between 10:30 a.m. and noon on Wednesday, June 18, 2025.
A video production crew will be filming along that portion of the roadway.
South Sonoma Ranch Boulevard
Intermittent Road Closure Along South Sonoma Ranch Boulevard
What: Temporary, intermittent, road closure.
When: 8:30-10:30 a.m. Wednesday, June 18, 2025.
Where: Sonoma Ranch Boulevard between Canyon Point Road and Dripping Springs Road.
Why: A video production crew will be filming in that area.
Road Closure – Triviz Dr. | June 18
Las Cruces motorists are advised that Triviz Drive between Fairfax Avenue and Mulberry Avenue will be closed to traffic, on Wednesday, June 18, 2025, between the hours of 9:30 a.m. and 4:00 p.m. A detour will be in place directing traffic around the work zone.
The road closure affects bus stops 9-14 on Roadrunner Transit Route 1.
Access to residences and businesses will be maintained during the closure. Motoristsare urged to follow all posted signs.
Morrow Enterprises, Inc., will be completing utility work on Triviz Drive. This work will be done in City Council District 1.
Road Construction – Sun Canyon Rd., Sun Canyon Ct. & Mesa Point Rd.
Las Cruces motorists are advised that Sun Canyon Road will experience temporary lane closures and shoulder work starting June 17, 2025. Work on Sun Canyon Court and Mesa Point Road will start June 18, 2025. Metronet will be installing new private telecommunication infrastructure. It is anticipated that all of the work in this neighborhood will take four (4) weeks to complete.
Access to residences and businesses will be maintained and Roadrunner Transit will not be affected. This work is being done in Council District #3.
Shoulder Work – Del Rey Blvd. | June 17, 2025
South bound commuters on Del Rey Blvd. between Bataan Memorial E. and Northrise Dr. will experience shoulder work on Tuesday, June 17, 2025, between the hours of 7:00 a.m. and 4:00 p.m.
DuCross Construction will be looking for underground utilities.
The work will not affect any Roadrunner Transit Routes or bus stops. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 3.
Shoulder Work – Parker Rd. | June 16 – June 23, 2025
Las Cruces Motorists will experience shoulder work on Parker Rd. from N. Reymond St. to N. Melendres St. starting June 16 through June 23, 2025.
Fibertex, LLC will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #4. Access to business will be maintained during the construction.
Maintenance Work – Calle de Nubes | June 12 – June 18, 2025
Las Cruces motorists are advised that G. Sandoval Inc under contract with the City of Las Cruces will be cleaning cracks and joints in the existing roadway surface and sealing cracks with hot-poured sealant on Calle de Nubes west of Norte Luz Dr. The work will start on June 12, 2025, through June 18. Weather delays may affect construction work.
For the public’s convenience, crews will work only from 7 a.m. to 5 p.m. Monday through Friday leaving evenings and weekends free of construction activity. Motorists wanting to avoid any possible delays should seek an alternative route. This work will not impact the Roadrunner Transit.
The work activity is in City Council District No. 5.
Shoulder Work – W. Greening Ave. | June 18 – June 27, 2025
Las Cruces Motorists will experience shoulder work on W. Greening Ave. and Parker Rd. starting June 18, through June 27, 2025.
Fibertex, LLC will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #4. Access to business will be maintained during the construction.
Shoulder Work – Creed Avenue | June 11 – June 20, 2025
Las Cruces Motorists will experience shoulder work on Creed Avenue between Spitz St. and Topley Ave. starting June 11, 2025, through June 20.
Fibertex, LLC will be installing underground infrastructure for Metronet Fiber as part of a utility permit.
The shoulder work will not affect the RoadRunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work – S. Walnut St. | June 10 – June 12, 2025
Shoulder work will be taking place along the southbound lane of S Walnut Street between the intersection of E. Lohman Ave and Walnut Street to approximately 360 feet along Walnut Street beginning Tuesday June 10, 2025, through Thursday June 12, 2025.
H&H Underground will be doing the work as part of a wire utility permit.
The shoulder work may impact the Roadrunner Transit routes 6 & 7. This work is being done in Council District #3.
Shoulder Work Barclay Court | June 12-19, 2025
Shoulder work will take place on Barclay Court from Bentley Drive starting June 12, 2025 and running through June 19, 2025.
Fibertex, LLC will be installing underground infrastructure for Metro Net Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. Access to residences will be maintained during the construction.
Road Closure – Garrison Rd. | June 10 – June 14, 2025
Las Cruces motorists are advised that Garrison Road from Myrtle Ave. to Wyoming Ave. will be closed to through traffic starting June 10, 2025. A Mountain Professional Construction, under contract with the City of Las Cruces, will be repaving the roadway. It is anticipated that the work will take three (3) days to complete.
Access to residences and businesses will be maintained during the work. Roadrunner Transit will not be affected. This work is being done in Council District #2.
Lane Closure – El Paseo Rd. | June 9 – June 13, 2025
Northbound commuters on El Paseo Rd. between Farney Lane and Lee Whisman Street will experience a lane closure on Monday, June 9, 2025, and will last through Friday, June 13, 2025.
H & H Underground will be placing underground utilities as part of a wire utility permit.
The work will not affect any Roadrunner Transit routes or bus stop locations. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 2.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Lane Closures & Shoulder Work – Stone Canyon Dr. | June 9 – June 24, 2025
Las Cruces motorists are advised that Stone Canyon Dr. will experience temporary lane closures and shoulder work starting June 9, 2025. Metronet will be installing new private telecommunication infrastructure. It is anticipated that the work will take two (2) weeks to complete.
Access to residences and businesses will be maintained and Roadrunner Transit will not be affected. This work is being done in Council District #3.
Shoulder Work – Boxster Way & Bentley Dr. | June 11 – June 17, 2025
Las Cruces Motorists will experience shoulder work on Bentley Dr from Buggatti Dr to end of Bentley Dr Cul-De-Sac. starting June 11 through June 17, 2025.
Fibertex, LLC will be installing underground infrastructure for Metro Net Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. Access to residents will be maintained during the construction. This work is being done in Council District #1.
Lane Closure – Sonoma Ranch Blvd. | June 9 – June 12, 2025
Las Cruces motorists are advised that Sonoma Ranch Blvd. at Cross Creek Rd. will experience temporary lane closures starting June 9, 2025.
H&H Construction will be installing new telecommunication infrastructure. It is anticipated that the work will take two (2) days to complete.
Access to residences and businesses will be maintained and Roadrunner Transit will not be affected. This work is being done in Council District #6.
Shoulder Work – Boxster Way & Bentley Dr. | June 9 – June 12, 2025
Las Cruces Motorists will experience shoulder work on Boxster Way from N. Triviz Dr to Bentley Dr. starting June 9, 2025, through June 12.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Shoulder Work – Graham St. and Sambrano Ave. | June 6
As part of wire utility permit the following streets will be impacted by shoulder work closures on Friday June 6, 2025.
The streets include:
- Graham St.: From Nevada Ave. to Sambrano Ave. This project is in City Council District 3.
- Sambrano Ave: From approximately 250 ft from the intersection of Sambrano Ave to Graham St.
This project is in City Council District 3.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Lane Closure – Lohman Ave. and Walnut St. | June 9, 2025
There will be road work at the Lohman Ave. and Walnut St. intersection that will cause temporary lane closures:
- There will be no southbound turns from Lohman Ave. onto Walnut St.
- All southbound lanes on Walnut St. will be closed
- No northbound turns from Walnut St. onto Lohman Ave.
- Northbound Walnut will remain open.
The work and closures will take place on Monday, June 9, 2025. The project is expected to be completed in one day.
The city road construction crew will be doing street maintenance on the roadway.
This work is to be done in Council District #3. Roadrunner Transit southbound routes on Walnut St. will be affected by the road closure. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
Road Closure – Triviz Dr. | June 10, 2025
Las Cruces motorists are advised that Triviz Drive between Fairfax Avenue and Mulberry Avenue will be closed to traffic, on Tuesday, June 10, 2025, between the hours of 9:30 a.m. and 4:00 p.m. A detour will be in place directing traffic around the work zone.
The road closure affects bus stops 9-14 on Roadrunner Transit Route 1.
Access to residences and businesses will be maintained during the closure. Motoristsare urged to follow all posted signs.
Morrow Enterprises, Inc., will be completing utility work on Triviz Drive. This work will be done in City Council District 1.
Lane Closure-North Motel Boulevard | June 9-July 9, 2025
Road work along north Motel Boulevard will cause intermittent lane closures between Maese Lane and Tashiro Drive beginning Monday, June 9, 2025.
The landscape work, to be done 7 a.m. to 5 p.m. Monday through Friday, is being done by Sandoval Construction and will last about one month. Motorists are asked to follow posted signage and watch for work crews.
Access to residences and businesses will be maintained throughout the project.
Lane Closure-East Mesquite Street | June 5-19, 2025
A portion of Mesquite Street, between Solano Drive and Madrid Avenue, will experience intermittent lane closures June 5-19, 2025, to allow Sandoval Construction to work on landscaping the median.
Work will be done 7 a.m. to 5 p.m. Monday through Friday. Motorists are asked to follow the posted signs and watch for crews. Access to residences and business will be maintained throughout the project. Work may affect Roadrunner Transit Route 8.
Shoulder Work – Triviz Dr. | June 4 – June 10, 2025
Las Cruces Motorists will experience shoulder work on Triviz Dr. from 2500 N. Triviz Dr. to Boxster Way for the north bound traffic starting June 4, 2025, through June 10th.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Shoulder Work – N. Alameda Blvd. | June 4 – June 10, 2025
Las Cruces Motorists will experience shoulder work on N. Alameda Blvd between Oxford Dr. and Harvard Dr. starting June 4, 2025, through June 10.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #4. Access to residents will be maintained during the construction.
Shoulder Work – N. Solano Dr. & E. Madrid Ave. | May 29 – June 6, 2025
Las Cruces Motorists will experience shoulder work on N. Solano Dr. between E. Madrid Ave. to E. Madrid Ave. Park Entrance for north bound traffic starting May 29, 2025, through June 6th.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Water Outage – Cortez Drive | June 2, 2025 9am-1pm
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Monday June 2, 2025. The areas that may be impacted are listed below.
- Intersection of Cortez Drive and Redlands Drive
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575-526-0500 for assistance
Water Outage – Cortez Drive | May 29, 2025 9am – 1pm
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Thursday May 29, 2025. The areas that may be impacted are listed below.
– Intersection of Cortez Drive and De Vargas Ave
– Intersection of Cortez Drive and Montezuma Ave
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575-526-0500 for assistance.
Road Construction – Panlener Ave. | May 30 – Approx. June 6, 2025
Las Cruces motorists are advised that Panlener Ave. from Solano Dr. to Locust St. will be closed to through traffic as early as May 30, 2025. A Mountain Professional Construction, under contract with the City of Las Cruces, will be repaving the roadway. It is anticipated that the work will take one week to complete.
Access to residences and businesses will be maintained during the work. Roadrunner Transit will not be affected. This work is being done in Council District #2.
Road Closures for Street Maintenance – Beginning May 29, 2025
Las Cruces motorists are advised that Andale Construction under contract with the City of Las Cruces, will be doing street maintenance work for eight (8) working days starting on Thursday May 29, 2025.
The scheduled road for maintenance will be closed for 24 hours after the road is treated. Weather delays may halt the maintenance project.
The areas affected are:
San Marino Rd: Between Whitetail Rd to Kaleidoscope Rd. (Saturday May 31, 2025)
Santa Alexandra Rd: Between Whitetail Rd. to Kaleidoscope Rd.
Santa Sophia Rd: Between Whitetail Rd.to Kaleidoscope Rd.
Caspian Rd: Between Whitetail Rd. to Kaleidoscope Rd.
Whitetail Rd: Between Caspian Rd. to San Marino Rd. (Saturday May 31, 2025)
Kaleidoscope Rd: Between Caspian Rd. to San Marino Rd.
Santa Minerva Ave: Between N. Sonoma Ranch Blvd. to Whitetail Rd.
Excelsior Rd: Between Caspian Rd. to San Marino Rd. (Saturday May 31, 2025)
Phillips Dr: Between Highland Ave to N. Alameda Blvd.
Princeton Dr: Between Harvard Dr to N. Alameda Blvd.
Clark Rd: Between Mayfield Rd. to Bruins Ln.
Bencomo Ln: Between EOP to Clark Rd.
Camelot Dr: Between Hoagland Rd. to Embassy Dr.
Embassy Dr: Between Hoagland Rd. to EOP (to South)
Eagle Ridge Dr: Between Sunridge Dr. to Mars Ave.
Highridge St: Between Sunridge Dr to Mars Ave.
Solarridge St: Between Sunridge Dr.. to Mars Ave.
Harrelson St: Between W Union Ave. to Conway Ave.
S. Almendra St: Between E. Bowman Ave. to E. Amador Ave.
Chiquita Ave: Between N. Virginia St. to N. Santa Fe St.
California Ave: Between Luna St. to Princess Jeanne Dr.
Lester Ave: Between Skyway Dr. to S Walnut St.
Mandy Ln: Between S. Walnut St to EOP
Garcia St: Between E. Lohman Ave to EOP
Paxton St: Between Mulberry Ave. to Oasis Ave.
Carrillo St: Between Solano Dr. to Gonzales St.
Carrillo Ct: Between EOP to Carrillo St.
Desert Dr: Between Hernandez Rd. to E. Madrid Ave.
Elder St: Between Montana Ave. to E. Boutz Rd.
Jones Rd: Between Montana Ave. to E. Boutz Rd.
West Park Dr: Between Farney Ln. to E. Boutz Rd.
Jordan Rd: Between Monte Vista (S. Side) to Plain St.
Terrace Dr: Between S. Telshor Blvd to E. University Ave. (Saturday May 31, 2025)
For the public’s convenience, crews will work only from 7 a.m. to 5 p.m. Monday through Friday leaving evenings free of construction activity. Saturday work will take place on roads mentioned above. Motorists wanting to avoid any possible delays should seek an alternative route.
This maintenance work will not affect the Roadrunner Transit.
This work is being done in Council District # 1, 2, 3, 4, 5.
For more information, text ROAD to (833) 359-7176 or visit HA5 online at http://www.ha5info.com/lascruces or contact the Public Works Department, Construction Management Administration section at 575/528-3098. The TTY number is 575/541-2182.
Elder St. Shoulder Work | May 28 – June 6, 2025
Las Cruces Motorists will experience shoulder work on Elder St. between Ash Ave. and Ebony Ave. starting May 28, 2025, to June 6th.
ARE Telecommunications LLC will be installing underground infrastructure for Vexus/Metronet.
The shoulder work will not affect the RoadRUNNER Transit.
This work is being done in Council District # 1.
For information contact the Public Works Department/Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Water Outage on Cortez Drive – May 28, 2025
Residents and businesses near Cortez Drive will experience a water outage from 9 a.m. until 1 p.m. Wednesday May 28, 2025.
The areas that may be impacted are listed below.
– Intersection of Cortez Drive and Porter Drive
– Intersection of Rising Sun Drive and Cortez Drive
The water outage will enable Caliper Construction to complete the water line tie-ins as part of a reconstruction Capital Improvement Project.
Adjacent areas also may be affected by the outage. If water on your street is scheduled to be turned off, the contractor will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182.
This work is being done in Council District No.6.
Construction on W. Amador Ave. | May 27 – July 1, 2025
Las Cruces motorists are advised that J29 Enterprises under contract with the City of Las Cruces will be working on manhole and valve adjustments. The work will start on Tuesday May 27, 2025, through July 1st. Weather delays may affect construction work.
The areas affected with traffic control:
W. Amador Ave.: Between N. Archuleta Rd to 1844 Amador Rd. (west bound traffic).
W. Amador Ave.: Between 1844 Amador Rd. to N. Archuleta Rd (east bound traffic).
For the public’s convenience, crews will work only from 7 a.m. to 5 p.m. Monday through Thursday leaving evenings and weekends free of construction activity. Motorists wanting to avoid any possible delays should seek an alternative route. This work will not impact the RoadRUNNER Transit.
The work activity is in City Council District No. 4.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Westbound Amador Dr. Lane Closure – May 27, 2025
There will be a lane closure in effect on Tuesday, May 27, 2025. Westbound Amador Dr. between S. Mesilla St. and S. Compress Rd. Traffic Control will be in place. Please follow the signage. The project is expected to be completed on June 3, 2025.
City Street Maintenance crew will be doing sidewalk maintenance.
This work is to be done in Council District #4 Roadrunner Transit routes will not be affected. The City has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
For information, please contact Streets Management at 575-541-2595. The TTY Number is 575-541-2182.
South Main St. and East Idaho Ave. Closure – May 27, 2025
There will be a lane closure in effect for northbound South Main Street and westbound Idaho Ave. on Tuesday, May 27, 2025.
The project is expected to be completed in two days. Please follow the traffic control that will be in place.
City Road Construction crew will be doing street maintenance at that intersection.
This work is to be done in Council District #3 Roadrunner Transit routes will not be affected. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
For information, please contact Streets Management at 575/541-2595. The TTY Number is 575-541-2182.
Water Outage Notice – May 27, 2025
Residents on the streets listed below will experience a water outage on Tuesday, May 27, 2025, between the hours of 9:00 a.m. and 1:00 p.m.
- Fairbanks Dr. (from San Acacio St. to Madrid Ave.)
- San Acacio St. (from Camino del Rex to Fairbanks Dr.)
- Arlington Ave. (from Camino del Rex to Fairbanks Dr.)
- Fairfax Ave. (from Camino del Rex to Fairbanks Dr.)
- Mariposa Dr. (from Camino del Rex to Fairbanks Dr.)
- Valencia Dr. (from Fairbanks Dr. to Acoma St.)
- Camino del Rex (from Desert Dr. to Mariposa Dr.)
- Country Club Circle
Morrow Enterprises, Inc., will be performing a water tie-in as part of a Capital Improvement Project.
Adjacent areas also may be affected. If water on your street is scheduled to be turned off, crews will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, the City officials recommend waiting for the water to become clear before washing laundry.
This work is being done in Council District No. 1.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182.
Shoulder Work – N. Alameda Blvd. | May 27 – May 30, 2025
Las Cruces Motorists will experience shoulder work on N. Alameda Blvd betweenOxford Dr and Harvard Dr starting May 27 through May 30, 2025.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #4. Access to residents will be maintained during the construction.
Road Maintenance – Dona Ana St. & W Union Ave | May 15, 2025
Streets Management will be applying a Fog Seal surface treatment on various city streets beginning on Thursday, May 15, 2025, with expected completion in one (1) day Residents and Businesses will be notified 24 hours prior to work beginning. We ask that you do not park cars on the street for the duration of the project.
Streets to be affected include:
- Dona Ana St. from May Ave. to Las Cruces Ave. work will be done in City Council District # 3
- W’ Union Ave. Bike/Walking Trail from Apple Cross Pl. to Harrelson St. work will be done in City Council District # 2
For the public’s convenience, crews will work from 7 a.m. to 5 p.m., Thursday May 15, 2025, Access to residences and businesses will be maintained with periodic closures during the construction period. Motorist are urged to use caution through this area or use alternate routes.
Roadrunner Transit routes will not be affected. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
For information contact the Public Works Dep
Shoulder Work – N. Solano Dr. & E. Madrid Ave. | May 21 – May 28, 2025
Las Cruces Motorists will experience shoulder work on N. Solano Dr. between E. Madrid Ave. to E. Madrid Ave. Park Entrance for north bound traffic starting May 21, 2025, through May 28.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Shoulder Work – Boxster Way and Bentley Drive | May 22 – 30, 2025
Shoulder work will take place on Boxster Way from N. Triviz Drive to Bentley Drive starting May 22, 2025, and continuing through May 30, 2025.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit. Access to residences will be maintained during the construction.
Shoulder Work – Camino Del Rex | May 15 – May 23, 2025
Las Cruces Motorists will experience shoulder work on Camino Del Rex from Legacy Dr. to end of cul-de-sac starting May 15, 2025, through May 23.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
Lane Closure El Paseo Rd. | May 14 and May 15, 2025
Northbound commuters on El Paseo Rd. between University Ave. and Monte Vista Ave. will experience a lane closure on Wednesday, May 14, 2025, and Thursday, May 15, 2025.
H & H Underground will be placing underground utilities as part of a wire utility permit.
The work will not affect any Roadrunner Transit routes or bus stop locations. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 2.
Water Outage Notice | May 13, 2025
Residents on the streets listed below will experience a water outage on Tuesday, May 13, 2025, between the hours of 9:00 a.m. and 1:00 p.m.
Morrow Enterprises, Inc., will be performing a water tie-in as part of a Capital Improvement Project.
Adjacent areas also may be affected. If water on your street is scheduled to be turned off, crews will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, the City officials recommend waiting for the water to become clear before washing laundry.
This work is being done in Council District No. 1.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance
Road Maintenance (Fog Seal) Various Streets | Friday, may 9 – May 10, 2025
Streets Management will be applying a Fog Seal surface treatment on various city streets beginning on Friday, May 9, 2025, and Saturday May 10, 2025 with expected completion in two days. Residents and Businesses will be notified 24 hours prior to work beginning.
Streets to be affected include:
· Dyne Ave. From Spitz St. to Johnson St.
· Organ Ave. From Hermosa St. to Solano Dr.
· Bowman Ave. From Solano Dr. to Dona Ana St.
· Del Monte St. From Lohman Ave. to Colorado Ave.
· Dona Ana St. From Las Cruces Ave. to Lohman Ave.
· Garcia St. from Lohman Ave. to Amador Ave.
· Del Monte St. from Lohman Ave. to Griggs Ave.
For the public’s convenience, crews will work from 7 a.m. to 5 p.m., Friday May 9, and Saturday May 10, 2025. Access to residences and businesses will be maintained with periodic closures during the construction period. Motorist are urged to use caution through this area or use alternate routes.
RoadRunner Transit routes will not be affected.
Lane Closure – S. Telshor Blvd. | May 12 – May 14, 2025
Las Cruces Motorists will experience a lane closure on S. Telshor Blvd between Sundown Rd. and Claude Dove Dr. for the south bound traffic. The lane closure will be in place starting May 12, 2025, through May 14. Access to businesses will be maintained during the construction.
H&H Underground will be installing underground infrastructure for UPN Fiber.
The lane closure will not affect the RoadrunnerTransit. This work is being done in Council District #3.
Durazno Street Shoulder Work | May 8 & 9, 2025
Shoulder work will take place along Durazno Street between the intersection of E. Idaho Ave. and Durazno Street to the intersection of Foster Road and Durazno Street from Thursday, May 8, 2025, to Friday, May 9, 2025.
H&H Underground will be doing the work as part of a wire utility permit.
The shoulder work will not impact the RoadRUNNER Transit routes.
Water Outage Near Madrid Avenue and Anita Drive | Thursday May 8 (9 a.m. to 1 p.m.)
Residents on the streets listed below will experience a water outage on Thursday, May 8, 2025, between the hours of 9:00 a.m. and 1:00 p.m.
· Madrid Avenue (from Evelyn St. to Martha Dr.)
· Anita Drive (from Madrid Ave. to Connie Lou Dr.)
Morrow Enterprises, Inc., will be performing a water tie-in as part of a Capital Improvement Project.
Adjacent areas also may be affected. If water on your street is scheduled to be turned off, crews will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, the City officials recommend waiting for the water to become clear before washing laundry.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182.
Shoulder Work Graham Street and Sambrano Avenue | May 7 – 20, 2025
As part of wire utility permit, Graham Street from Nevada Avenue to Sambrano Avenue and Sambrano Avenue from approximately 250 feet from the intersection of Sambrano Avenue to Graham Street will be impacted by shoulder work closures beginning Wednesday May 7, 2025, through approximately Tuesday May 20, 2025.
Crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free from construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
RoadRUNNER Transit Routes or bus stops will not be affected.
Lane Closure – Sonoma Ranch Boulevard | May 7 – May 9, 2025
Sonoma Ranch Boulevard Lane Closure (Lohman Ave. to Camino Coyote)
Northbound commuters on Sonoma Ranch Blvd. between Lohman Ave. and Camino Coyote will experience a lane closure on Wednesday, May 7, 2025, through Friday, May 9, 2025.
Renegade Construction, LLC, will be placing underground utilities as part of a wire utility permit.
The work will be on Roadrunner Transit Route 2 but will not affect any bus stop locations. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 6.
Dunn Drive Road Closure | May 5 – Approx. May 19, 2025
Las Cruces motorists are advised that Dunn Drive will be experiencing a road closure from Reynolds Drive to Aldrich Road starting Monday May 5, 2025. Caliper Construction will be doing work as part of the City of Las Cruces East Mesa Roads and Drainage. Beginning Monday May 5, 2025, during construction, access to DunnDrive will not be permitted to through traffic. The road closure will last approximately two (2) weeks. Detours and signage will be present directing traffic around the work zone.
Motorists wishing to avoid possible delays are encouraged to seek alternative routes. RoadRUNNER Transit Route routes will not be affected.
This work is being done in Council District #6.
Cielo Bonito Court and Cielo Vista Court Shoulder Work | May 5- 16, 2025
Las Cruces Motorists will experience shoulder work on Cielo Bonito Court and Cielo Vista Court from Spitz Street from May 5 – 16, 2025.
Pauley Construction, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit.
Access to residents will be maintained during the construction.
Chip Seal Treatment on Various City Streets | May 2 – 3, 2025
Streets Management will be applying a Chip Seal surface treatment on various city streets from May 2 -3, 2025. Completion is expected in two days. Residents and Businesses will be notified 24 hours prior to work beginning.
Affected Streets:
· Dyne Ave. From Spitz St. to Johnson St.
· Bowman Ave. From Solano Dr. to Dona Ana St.
· Organ Ave. From Solano Dr. to Hermosa St.
· Garcia St. From Lohman Ave. to Amador Ave.
· Dona Ana St. From May Ave. to Lohman Ave.
· Del Monte St. From Griggs Ave. to Lohman Ave.
For the public’s convenience, crews will work from 7 a.m. to 6 p.m., Friday May 2, 2025, and Saturday May 3, 2025, Access to residences and businesses will be maintained with periodic closures during the construction period. Motorist are urged to use caution through this area or use alternate routes.
RoadRunner Transit routes will not be affected.
Howard Place Shoulder Work | May 5 – 7, 2025
Shoulder work will take place on Howard Place north of the intersection from Camino Coyote starting May 5 and running through May 7, 2025.
A&J Boring will be installing underground infrastructure for CONTERRA Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit.
Calle de Ninos Lane Closure | May 5 – Approx. May 7, 2025
Las Cruces motorists are advised that Calle de Ninos from Calle de Alegra to the eastern cul-de-sac will have a lane closure beginning Monday, May 5, 2025. The closure will last for approximately 2 days in duration.
Access to residences and businesses will be maintained during the closure. Motorists are urged to follow all posted signs. The work and lane closure will not affect Roadrunner Transit or transit stops.
DuCross Construction, LLC. will be completing utility work at this location. This work will be done in City Council District 2.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
N. Valley Dr. Maintenance Work | May 6 – June 17, 2025
Las Cruces motorists are advised that G. Sandoval Inc under contract with the City of Las Cruces will be cleaning cracks and joints in the existing roadway surface and sealing cracks with hot-poured sealant on N. Valley Drive from W. Picacho to the north City limits. The work will start on May 6, 2025, through June 17. Weather delays may affect construction work.
For the public’s convenience, crews will work only from 7 a.m. to 5 p.m. Monday through Friday leaving evenings and weekends free of construction activity. Motorists wanting to avoid any possible delays should seek an alternative route. This work will impact the Roadrunner Transit for bus route 6 & 7.
The work activity is in City Council District No. 4.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
East Lohman Ave. Intermittent Lane Closures | May 5 – Approx. June 5, 2025
Las Cruces motorists are advised that East Lohman Ave will be experiencing intermittent lane closures from the intersection of Del Monte Street and E Lohman Ave. to the intersection of Espanola Street and E Lohman Ave. starting Monday May 5, 2025. G. Sandoval Construction will be doing work as part of the City of Las Cruces City Bond Median Landscape Ph.2 project. The intermittent lane closure will last approximately one (1) month. Detours and signage will be present directing traffic around the work zone.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Route 8 may be affected.
This work is being done in Council District #3.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Red Hawk Gold Road Closure | May 5 – May 12, 2025
Red Hawk Golf Road Closure
Las Cruces motorists are advised that Red Hawk Golf Road, Peachtree Hills Rd. to Arroyo Rd., will be closed to traffic starting May 5, 2025. Caliper Construction, as part of a private subdivision development, will be installing a new water main. It is anticipated that the work will take one (1) week to complete.
Access to residences and businesses will be maintained via detours. Roadrunner Transit will not be affected. This work is being done in Council District #5.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Emergency Lane Closure (Between Campo Street and Amador Avenue) | Now – May 2, 2025
Emergency Lane Closure (Between Campo Street and Amador Avenue)
An emergency lane closure on S. Campo St. between E. Amador Ave. and Kansas Ave. will take place for the southbound traffic.
A drop lane will be provided for the southbound traffic. The lane closure will be in place starting today, April 30, through May 2, 2025. Access to businesses will be maintained during the emergency.
El Paso Electric will be repairing underground infrastructure that was damaged.
The lane closure will affect the RoadRUNNER Transit route 2 for bus stop 2.
For information contact the Public Works Department/Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Camino Del Rex Shoulder Work | May 1 – 8, 2025
Shoulder work will take place on Camino Del Rex between Desert Drive and 300-feet past Legacy Drive starting May 1, 2025 and continuing through May 8.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit.
Legacy Drive & Heart Drive Shoulder Work | May 5-8, 2025
Shoulder work on Legacy Drive from Camino Del Rex and down Heart Drive will start Monday May 5, 2025 and run through May 8, 2025.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Desert Drive Shoulder Work | May 5 – 8, 2025
Desert Drive Shoulder Work
When: Monday May 5, 2025, through May 8.
Where: Shoulder work will take place on Desert Drive between Oleander Drive and Palo Verde.
More details: Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit.
Chip Seal Treatments/Various Streets | Today Only
Streets Management will be applying a Chip Seal surface treatment on various city streets.
When:
Today April 29, 2025, with expected completion in one day.
Where:
· Dyne Ave. From Spitz St. to Johnson St. Work will be done in city council district # 1
· Del Monte St. From Lohman Ave. to Colorado Ave. Work will be done in city council district # 3
· Dona Ana St. From Las Cruces Ave. to May Ave. Work will be done in city council district # 3
Additional Details:
Crews will work from 7 a.m. to 6 p.m., Tuesday, April 29, 2025, Access to residences and businesses will be maintained with periodic closures during the construction period.
RoadRunner Transit routes will not be affected.
W. Amador Construction | May 1 – 30, 2025
Construction on W. Amador Ave.
When: The work will start on Monday May 5, 2025, through May 30. Weather delays may affect construction work.
Where: W. Amador Ave.: Between N. Valley Dr. to 1844 Amador Rd. (west bound traffic).
W. Amador Ave.: Between 1844 Amador Rd. to N. Valley Dr. (east bound traffic).
Additional Details: Cutler Repaving, Inc. under contract with the City of Las Cruces will be milling the existing asphalt and installing new asphalt. For the public’s convenience, crews will work only from 7 a.m. to 7 p.m. Monday through Friday leaving evenings and weekends free of construction activity. This work will not impact the RoadRUNNER Transit.
Lane Closure Campo Street (between Amador and Kansas Avenue southbound)| April 29 – May 9, 2025
Las Cruces Motorists will experience a lane closure on S. Campo St. between E. Amador St. and Kansas Ave. for the south bound traffic. The lane closure will be in place starting April 29, 2025, through May 9. Access to businesses will be maintained during the construction.
Volt Inc. will be installing underground infrastructure for UPN Fiber.
The lane closure will affect the RoadRUNNER Transit bus stop 2 for route 2.
Intermittent Lane Closures E. Court Avenue | April 28-May 5, 2025
Intermittent Lane Closures E. Court Avenue
When: through – Monday, May 5, 2025
Duration: About one week
Where: The streets include:
· E Court Ave.: The intersection of N Mesquite Ave and E Court Ave to the intersection of E Court Ave. to N Tornillo Street.
Details: As part of wire utility permit the E. Court Avenue may have intermittent lane closures beginning Monday April 28, 2025, through approximately Monday May 5, 2025.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
RoadRUNNER Transit Routes or bus stops will not be affected.
Shoulder Work El Paseo Road Extended | Through May 5, 2025
Shoulder Work on El Paseo Rd. between Wyatt Dr. and S. Main St. work will continue till May 5, 2025.
A temporary lane closure may be in effect at El Paseo Rd. and Wyatt Dr.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit.
Valencia Dr. Road Closure | April 21 – May 5, 2025
Valencia Drive Road Closure Notice
Las Cruces motorists are advised that Valencia Dr. from Martha Dr. to Camino del Rexwill be closed to through traffic starting April 21, 2025. A Mountain Professional Construction, under contract with the City of Las Cruces, will be repaving the roadway. It is anticipated that the work will take up to two (2) weeks to complete.
Access to residences and businesses will be maintained during the work. RoadRUNNER Transit will not be affected. This work is being done in Council District #1.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Road Work – Canyon Point Rd. | April 25 – Approx. May 5, 2025
Road work will be taking place on Canyon Point Road between Sonoma Ranch Boulevard and Canyon Verde. City crews will be installing speed cushions on Canyon Point Road. This work will be starting Monday, April 21, 2025, and will take approximately 2 weeks to complete. Motorists are asked to use caution through the area or use an alternate route to avoid possible delays.
The road work will not impact the Roadrunner Transit. This work is being done in Council District #6.
For more information, contact the Public Works Department, Traffic Management section at 575/541-2505. The TTY number is 575/541-2182.
Various Intermittent Lane Closures | April 14 – April 25, 2025
Starting April 14, 2025, through April 25, 2025, the following streets will have intermittent lane closures:
- Southbound commuters on Roadrunner Parkway between Frontier Drive and Golf Club Road. Bus stop #36 on Roadrunner Transit Route 3 will be affected by the roadwork.
- Golf Club Road between Roadrunner Parkway and Sonoma Springs Avenue.
- Sonoma Springs Avenue from Golf Club Road to approximately 500-ft east of Golf Club Road.
Volt Construction will be placing underground infrastructure as part of a wire utility permit.
The work will be in place between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 6.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Elks Drive Shoulder Work | April 14 – April 18, 2025
Starting April 14, 2025, through April 18, 2025, Elks Drive between Tamony Lane and Zertuche Lane will experience shoulder work. Roadrunner Transit routes will not be affected by the shoulder work.
Volt Construction will be placing underground infrastructure as part of a wire utility permit.
The work will be in place between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done adjacent to City Council District 5.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
New All-Way Stop Control at the Intersection of Hadley Avenue and Seventeenth Street
Las Cruces motorists are advised that the traffic signal upgrades will be performed at the intersection of Hadley Ave. and Walnut St. beginning on Tuesday, April 15, 2025. The current Traffic signal will not be operational and four way stop signs will be in place while upgrades are being performed. All traffic approaching the intersection on Hadley Avenue or Walnut Street will be required to stop.
Roadrunner Transit routes will not be affected. The traffic control that will take place at this intersection is in Council District #1 and #3.
For more information, contact the Public Works Department, Traffic Management section at 575/541-2505. The TTY number is 575/541-2182.
Entrada Del Sol and S. Walnut Street Shoulder Work | Tue., April 15 -Wed., April 13, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning Tuesday April 15, 2025, through approximately Wednesday April 30, 2025.
The streets include:
- Entrada Del Sol: The work will be taking place from South Walnut to S. Triviz Dr. This project is in City Council District 3.
- S Walnut St.: The intersection of S Walnut St. and Entrada Del Sol will be also having flaggers present to assist with the shoulder work. This project is in City Council District 3.
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
RoadRUNNER Transit Routes or bus stops affected may be routes 6 & 7.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Griggs Avenue and Solano Drive Road and Lane Closure | April 9, 2025
UPDATE!!! as of 12:35 p.m. April 8, 2025.
This Lane closure has been updated to a street closure.
NEW INFO – Griggs Avenue will be closed for through traffic from Solano Drive to Nevarez Street. Detours will be in place. Northbound Solano Drive will have one lane closure.
ORIGINAL POST
Lane Closure on Northbound Solano Dr. at Griggs Ave.
When: Wednesday, April 9, 2025. The project is expected to be completed in one day.
Where: Northbound Solano Dr. at the intersection of Griggs Ave.
Traffic Impact:
- Traffic Control will be in place. Please follow the signage.
- City Road Construction crew will be doing street maintenance on the roadway.
- Roadrunner Transit routes will not be affected.
- The City has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
This work is to be done in Council District #1.
More Info: Streets Management at 575/541-2595. The TTY Number is 575-541-2182.
Shoulder Work – S. Campo St. (E. Lohman Ave. to E. Amador Ave.) | April 9 – April 11, 2025
Las Cruces Motorists will experience shoulder work on S. Campo St. between E. Lohman Ave. to E. Amador Ave. starting Wednesday April 9, 2025, through April 11.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to business will be maintained during the construction.
For more information, contact the Public Works Department, Construction Managementsection at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work – S. Campo St. (Colorado Ave. – Kansas Ave.) | April 9 – April 16, 2025
Las Cruces Motorists will experience shoulder work on S. Campo St. from Colorado Ave. to Kansas Ave. starting Wednesday April 9, 2025, through April 16.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to business will be maintained during the construction.
For more information, contact the Public Works Department, Construction Managementsection at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work Closure – S. Alameda Blvd. and W. Amador Ave. to W. May Ave. | April 9 – April 14, 2025
Las Cruces Motorists will experience shoulder work from the intersection of S. Alameda Blvd. and W. Amador Ave. to W. May Ave. starting Wednesday April 9, 2025, through April 14.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to business will be maintained during the construction.
For more information, contact the Public Works Department, Construction Managementsection at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closure – South Bound Telshor Blvd. (Commerce Dr. to Summit Ct.) | April 7, 2025
There will be intermittent lane closures on Monday, April 7, 2025, on southbound Telshor Blvd. from Commerce Dr. to Summit Ct. The project is expected to be completed in one day. Traffic control will be in place.
City Road Construction crew will be repairing a damaged guardrail.
This work is to be done in Council District #3. The city has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
For information, please contact Streets Management at 575/541-2595. The TTY Number is 575-541-2182.
Shoulder Work Closure – S. Main St. & E. Amador Ave | April 9 – April 18, 2024
Las Cruces Motorists will experience shoulder work on S. Main St. between Bowman Ave. and E. Lohman Ave. starting Wednesday April 9, 2025, through April 18.
A temporary lane closure may be in effect on: S. Main St. & E. Amador Ave.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1 and #4. Access to business will be maintained during the construction.
For more information, contact the Public Works Department, Construction Managementsection at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work Closure – E. Lucero Ave & N. Almendra St. | April 8 – April 10, 2025
Las Cruces Motorists will experience shoulder work on E. Lucero Ave & N. Almendra St. starting Tuesday April 8, 2025, through April 10.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to business will be maintained during the construction.
For more information, contact the Public Works Department, Construction Managementsection at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work Closure – E. Chestnut Ave. and N. Campo St. | April 7 – April 10, 2025
Las Cruces Motorists will experience shoulder work on E. Chestnut Ave. from the drainage channel to N. Mesquite St. and at the intersection of E. Chestnut Ave and N. Campos St. starting Monday April 7, 2025, through April 10.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber as part of a utility permit.
The shoulder work will not affect the Roadrunner Transit. This work is being done in Council District #1. Access to business will be maintained during the construction.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Lane Closure – Northrise Drive (Cross Creek Rd. – Rinconada Blvd.) | April 8 – April 10, 2025
Las Cruces motorists are advised that the westbound right lane on Northrise Drive between Cross Creek Road and Rinconada Blvd. will be closed starting Tuesday April 8, 2025. Caliper Construction will be doing utility work as part of a private development. This work is anticipated to take two (2) days to complete. Access to businesses will be maintained during construction.
Roadrunner Transit Route routes will not be affected. This work is being done in Council District #6.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work Closures – W. May Ave. (Alameda Blvd. to S Church St.) | April 3 – April 11, 2025
As part of wire utility permit the following street will be impacted by shoulder work closures beginning Thursday April 3, 2025, through approximately Friday April 11, 2025.
The street include:
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
RoadrunnerTransit Routes or bus stops affected may be routes 2.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Shoulder Work Closure – N. Church St. (E. Las Cruces Ave. to W. Bowman Ave.) | April 3 – April 10, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning Thursday April 3, 2025, through approximately Thursday April 10, 2025.
The streets include:
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops affected may be routes 2.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Intermittent Road Closures – N. Campo St. & Augustine Ave. | April 1 – April 4, 2025
As part of wire utility permit the following streets will be impacted by intermittent laneclosures beginning Tuesday April 1, 2025, through approximately Friday April 4, 2025.
The streets include:
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops will not be affected.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Road Closure – Mariposa Dr. (Desert Dr. to Fairbanks Dr.) | April 1 – Approx. April 15, 2025
Las Cruces motorists are advised that Mariposa Drive, from Desert Drive to Fairbanks Drive, will be closed to thru traffic on April 1, 2025. A Mountain Professional Construction, under contract with the City, will be repaving the roadway. It is anticipated that the work will take two (2) weeks to complete.
Access to residences and businesses will be maintained during the closure. Roadrunner Transit will not be affected. This work is being done in Council District #1.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closures – Valley Drive and Hickory Drive on Monday, March 31, 2025
The following streets will have intermittent lane closures from 7 a.m. to 4 p.m. on Monday, March 31, 2025.
· Northbound commuters on Valley Drive between Marquess St. and Barker Rd.
· Southbound commuters on Valley Drive between Rigsby Rd. and Barker Rd. Bus stop 6 on Roadrunner Transit Route 4 will be impacted.
· Hickory Drive south of Avenida de Mesilla. Bus stops 6 and 28 on Roadrunner Transit route 4 will be impacted.
Sandoval Construction will be doing asphalt and concrete restorations as part of a wire utility permit.
Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 4.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182
Intermittent Lane Closures – Roadrunner Parkway | March 31 – Approx. July 31, 2025
Road Closure – Madrid Ave. (Triviz Dr. to Evelyn St.) | March 31 – Approx. September, 2025
Madrid Avenue Extension Road Closure
Las Cruces motorists are advised that Madrid Ave. between Triviz Drive and Evelyn Street will be closed to thru traffic, beginning March 31, 2025. The closure will last for approximately 4 months in duration. A detour will be in place directing traffic around the work zone.
Access to residences and businesses will be maintained during the closure. Motoristsare urged to follow all posted signs. The work and closure will not affect RoadrunnerTransit or transit stops.
Morrow Enterprises, Inc., will be completing utility and roadway work on Madrid Avenue. This work will be done in City Council District 1.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Lane Closure – W. Lohman Ave. (S. Water St. to S. Main St.) | April 3 – April 7, 2025
Las Cruces Motorists will experience a lane closure on W. Lohman Ave. between S. Water St. and S. Main St. The lane closure will be in place starting April 3, 2025, to April 7. Access to businesses will be maintained during the construction.
Fibertex, LLC will be installing underground infrastructure for Vexus Fiber.
The lane closure will not affect the Roadrunner Transit. This work is being done in Council District #4.
For information contact the Public Works Department/Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Lane Closure – Sedona Hills Pkwy (Sonoma Ranch Blvd. to Council Oak Rd.) | March 31 – April 4, 2025
A lane closure will be taking place westbound on Sedona Hills Pkwy from the intersection of Sonoma Ranch Blvd. and Sedona Hills Pkwy to the intersection of Sedona Hills Pkwy and Council Oak Rd beginning Monday March 31, 2025, through April 4, 2025.
Kelly Cable will be doing the work as part of a wire utility permit.
The lane closure will impact the Roadrunner Transit Route 2. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 6.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work Closures – Graham St., Sambrano Ave., and Stull Dr. | March 26 – April 2, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning Wednesday March 26, 2025, through approximately Wednesday April 2, 2025.
The streets include:
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops will not be affected.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Shoulder Work Closures – Entrada Del Sol & Mandy Lane | March 26 – April 2, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning Wednesday March 26, 2025, through approximately WednesdayApril 2, 2025.
The streets include:
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops affected may be routes 6 & 7.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Road Closure – Mariposa Drive | March 25 – Approx. April
Mariposa Temporary Road Closure
Las Cruces motorists are advised that Mariposa Drive will be closed to thru traffic as early as March 25, 2025. The closure will be near 1635 Mariposa Drive. A Mountain Professional Construction, under contract with the City, will be undertaking sewer improvements. It is anticipated that the work will take one week to complete.
Access to residences and businesses will be maintained during the closure. RoadRUNNER Transit will not be affected. This work is being done in Council District #1.
For more information, contact the Public Works Department, Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closure – Via del Villa and the intersection of Parkhill Dr. and Torreon | March 25 – April 11, 2025
An intermittent lane closure will continue Tuesday March 25, 2025, until April 11, 2025,near Via del Villa and the intersection of Parkhill Dr. and Torreon.
Renegade Construction will be doing the work as part of a subdivision permit.
The lane closure will not impact the Roadrunner Transit Route. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done between City Council District 5.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Lane Closure – Missouri Ave. (Gladys Dr. to Payne St.) | March 24 – April 4
Las Cruces Motorists will experience a lane closure on Missouri Ave. from Gladys Dr. to Payne St. for the east bound traffic.
This closure will be in place for two weeks starting March 24, 2025, through April 4.Access to residents and businesses will be maintained during the construction.
Volt Incorporated will be installing underground infrastructure for UPN Communications.
The lane closure will not affect the RoadRUNNER Transit. This work is being done in Council District #2.
For information contact the Public Works Department/Construction Management section at 575/528-3098. The TTY number is 575/541-2182.
Shoulder Work Closures – N. Willow St. and Birch Dr. | March 24 – March 28
Las Cruces Motorists will experience shoulder work on N. Willow St. and Birch Drivestarting Monday March 24, 2025, through March 28.
AITS with Shamroy Powell will be installing underground infrastructure for Vexus Fiberas part of a utility permit.
The shoulder work will not affect the RoadRUNNER Transit. This work is being done in Council District #1. Access to residents will be maintained during the construction.
For more information, contact the Public Works Department, Construction Managementsection at 575/528-3098. The TTY number is 575/541-2182.
Road Closure – West Park Drive (between Farney Ln. and Lee Whisman) | Beginning March 24
Las Cruces motorists are advised that West Park Drive between Farney Lane and Lee Whisman will be closed to traffic starting March 24, 2025.
Caliper Construction will be doing utility work as part of a private apartment development.
The work is anticipated to take one (1) week to complete.
Detours will be in place. Roadrunner Transit routes will not be affected.
This work is being done in Council District #2.
Water Outage – Powder River Dr., Arabela Dr., and Big Springs St. | March 20 9am-1pm
Water Outage on Powder River Dr., Arabela Dr., and Big Springs St.
Residents on the streets listed below will experience a water outage on Thursday, March 20, 2025, between the hours of 9:00 a.m. and 1:00 p.m.
Caliper Construction, Inc. will be performing a water tie-in as part of a residential development permit.
Adjacent areas also may be affected. If water on your street is scheduled to be turned off, crews will post a door hanger notice a minimum of 24 hours in advance.
Once service is restored, residents may notice discolored water due to iron, manganese, and calcium deposits. Although the water is safe to drink, the City officials recommend waiting for the water to become clear before washing laundry.
This work is being done in Council District No. 5.
The discoloration should disappear within 24 hours. If it does not, residents should flush all faucets in their house for five minutes. If the discoloration remains, call the City at 575/526-0500 for assistance. The TTY phone number is 575/541-2182.
Intermittent Lane Closures – Valley Dr. (at Avenida de Mesilla Intersection) | March 18-20, 2025
Northbound commuters on Valley Drive (at Avenida de Mesilla Intersection) will have intermittent lane closures starting Tuesday, March 18, 2025, and will last through March 20, 2025, between the hours of 7:00 a.m. and 4:00p.m.
FiberTex will be placing underground utilities as part of a wire utility permit.
The work will be on Roadrunner Transit Route 7 but will not affect any bus stops.Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 4.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closure – Northrise Drive (at Roadrunner Pkwy Intersection) | March 17 – 28, 2025
Westbound commuters on Northrise Drive (at Roadrunner Parkway Intersection) will have intermittent lane closures starting Monday, March 17, 2025, and will last through March 28, 2025, between the hours of 7:00 a.m. and 4:00p.m.
Volt Inc. will be placing underground utilities as part of a wire utility permit.
The work will be on Roadrunner Transit Route 3 but will not affect any bus stops. Access to residences and businesses will be maintained throughout the project. Commuters are urged to follow all posted signs.
This work is being done in City Council District 3.
For information, call the Public Works Department/Construction Management at 575/528-3098. The TTY number is 575/541-2182.
Intermittent Lane Closures – Mesa Grande and Bataan Memorial West | March 13 – April 13, 2025
Mesa Grande Drive will experience intermittent lane closures near the intersection at Mesa Grande Drive and Bataan Memorial West starting Thursday March 13, 2025. G. Sandoval Construction will be doing work as part of the City of Las Cruces City Bond Median Landscape Ph.2 project. The intermittent lane closure will last approximately one month. Detours and signage will be present directing traffic around the work zone.
Crews will only work between 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
RoadRUNNER Transit Route 3 may be affected.
Lane Closure – Valley Drive (Marquess St. to Barker Rd.) | March 13-17, 2025
A lane closure for northbound commuters on Valley Dr. between Marquess St. and Barker Rd. will be in place starting Thursday, March 13, 2025, and lasting through Monday, March 17, 2025, between the hours of 7:00 a.m. and 4:00 p.m. The lane closure will not be up on evenings or weekends.
Fibertex will be placing underground utilities in the vicinity.
The work is being done in City of Las Cruces Council District 4.
Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Work will be in place along Roadrunner Transit Route 7 but will not affect any bus stop locations.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Lane Closure – Northbound S. Main Street at Wyatt Drive | March 10 – 20, 2025
There will be a lane closure in effect Tuesday, March 10, 2025, for Northbound S Main and Wyatt. The project is expected to be completed on March 20, 2025.
The City of Las Cruces Flood and Construction crew will be doing storm drain maintenance at that intersection of S. Main and Wyatt.
Shoulder Work Closures – Nevada Ave., Graham St., Sambrano Ave., Stull Dr. | March 10 – 21, 2025
As part of wire utility permit the following streets will be impacted by shoulder work closures beginning March 10, 2025, through approximately Friday March 21, 2025.
The streets include:
For the public’s convenience, crews will only work from 7 a.m. to 5 p.m. Monday to Friday, leaving evenings and weekends free of construction activity. Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
Roadrunner Transit Routes or bus stops will not be affected.
For information, call the Public Works Department/Construction Management at (575) 528-3098. The TTY number is (575) 541-2182.
Lane Closure – Tashiro Drive (between North Valley Drive and Motel Boulevard) | March 11 – 14
Las Cruces motorists are advised that Tashiro Drive between North Valley Drive and Motel Boulevard will have a lane closure in the westbound lane. The closure is scheduled to begin Tuesday, March 11, 2025. The closure will last for approximately 3 days in duration.
Access to businesses and residences will be maintained during the closure. Motorists are urged to follow all posted signs. The work and closure will not affect Roadrunner Transit or transit stops.
Caliper Construction will be completing roadway work at this location. This work will be done in City Council District 4.
Lane Closure – Valley Drive (Boutz Rd. to Barker Rd.) | March 5 – March 12
A lane closure for northbound commuters on Valley Dr. between Boutz Rd. and Barker Rd. will be in place starting Wednesday, March 5, 2025, and lasting through Wednesday, March 12, 2025, between the hours of 7:00 a.m. and 4:00 p.m.
- Fibertex will be placing underground utilities in the vicinity.
- The work is being done in City of Las Cruces Council District 4.
- Access to residences and businesses will be maintained throughout the project. Motorists are urged to follow all posted signs.
- Work will be in place along Roadrunner Transit Route 7 but will not affect any bus stops.
Lane Closure – Southbound Elks Dr. on March 5th
There will be a lane closure in effect Wednesday, March 5th, 2025, for southbound Elks Dr. from Devendale Ave. to Avondale Dr. The project is expected to be completed in one day.
City Road Construction crew will be doing street maintenance at that intersection.
This work is to be done in Council District #1. Roadrunner Transit routes will not be affected. The City has verified that no conflicting public or private construction projects will take place in the immediate area during this time.
Shoulder Work N. Valley Drive (Between McClure Road and Bruins Lane)
Shoulder work will be taking place on the northbound lane of N Valley Dr. between McClure Rd. to Bruins Lane. The work will begin Monday March 3, 2025, to Friday March 7, 2025.
Turquoise Mountain Construction will be doing the work as part of a wire utility permit.
The shoulder work will impact the RoadRUNNER Transit route 6.
Lane Closure – Valley Drive (Between Rigsby Road and Barker Road)
A lane closure for southbound commuters on Valley Dr. between Rigsby Rd. and Barker Rd. will be in place Monday, March 3, 2025 through Friday, March 7, 2025, between the hours of 7 a.m. and 4 p.m.
Fibertex will be placing underground utilities in the vicinity.
Work will be in place along Roadrunner Transit Route 6 and will affect bus stop #4.
Road Closure – Solano Drive (Various affected areas)
Solano Drive will continue to experience a road closure due to the testing for the new water main before it can be connected to the existing water system. Work will continue through March 14, 2025.
A detour route will be provided to detour traffic through neighboring streets; we ask that you please follow the detour signage that will be installed.
The areas affected are:
N. Main Street: Solano Drive for the southbound traffic a road closure will be in effect.
N. Mesquite St.: Solano Drive a road closure will be in effect.
Solano Drive: E. Madrid Ave. the left turn lane for westbound traffic will be closed.
Solano Drive: Northbound traffic will be shifted to one lane to N. Main St.
E. Madrid Ave.: Solano Drive the left turn lane for the northbound traffic will be closed.
Apodaca Park: Solano Drive westbound traffic will be closed.
E. Madrid Ave. will have the right turn open for southbound traffic on Solano Drive.
Renegade Construction will be doing the work as part of a site development permit. The work will include new sewer line and manholes, a new water line and the removal of existing asphalt and installation of new asphalt.
The work will impact the RoadRUNNER Transit Route 8 bus stop 27 at Mesquite & Madrid.
Continued Shoulder Work – Valley Drive to Boutz Road
Las Cruces Motorists will experience continued shoulder work on Valley Drive from Boutz Road to Rigsby Road Monday, March 3, 2025 through March 7, 2025.
Volt Incorporated will be potholing for existing underground infrastructure before boring a new underground infrastructure for Unite Private Networks as part of a utility permit.
The shoulder work will affect the RoadRUNNER Transit route 7 bus stop 35.
Lane Closure – Via del Villa and Parkhill Drive and Torreon Road
An intermittent lane closure will continue Monday March 3, 2025, until March 19, 2025, near Via del Villa and the intersection of Parkhill Drive and Torreon Road.
Renegade Construction will be doing the work as part of a subdivision permit.
The lane closure will not impact the RoadRUNNER Transit Route.
Shoulder Work – Noria Court
Shoulder work will be taking place on Noria Court between Torreon Rd. to the end of the Cul-de-sac.
The work will begin Monday March 3, 2025, to Tuesday March 4, 2025.
H&H Underground will be doing the work as part of a wire utility permit.
The shoulder work will not impact the RoadRUNNER Transit routes.
Lane Shift – Hickory Drive
A lane shift will be in place on Hickory Drive south of Avenida de Mesilla Monday, March 3, 2025 through Wednesday, March 5, 2025, between the hours of 7 a.m. and 4 p.m. Fibertex will be installing underground wire utilities in the vicinity.
This work will affect bus stops 6 and 28 on Roadrunner Transit Route 4.
Lane Shift on Three Crosses
A lane shift for westbound commuters will be in place on Three Crosses Avenue between Alameda Blvd. and Spitz St. Monday, March 3, 2025 through Friday, March 14, 2025.
The lane shift will not affect the traffic control on North Main Street. Two-way traffic on Three Crosses Avenue will be maintained at all times.
Caliper Construction, Inc. will be placing a deceleration lane as part of a commercial building permit.
Roadrunner Transit Routes or bus stops will not be affected.
Valley Drive – Potential Closure
Motorists who travel along Valley Drive will experience shoulder work, and a possible lane closure, Tuesday, Feb. 25, through March 7, 2025, between Rigsby Road and Avenida de Mesilla.
As part of a utility permit, Volt Incorporated will be potholing for existing underground infrastructure before boring a new underground infrastructure for Unite Private Networks.
The shoulder work will not affect Roadrunner Transit.
Road Closures: Farney Ln. & West Park Dr.
🛠 When:
Wednesday, February 26, 2025
📍 Locations:
Farney Ln. between El Paseo Rd. & Cotton Ave.
West Park Dr. between Farney Ln. & Lee Whisman
Details:
Caliper Construction will be performing work for a private apartment development.
Transit Impact: Roadrunner Transit routes will not be affected.
City District: Council District 2.
Detours will be in place.
Safety Tips:
Follow all posted signs and detour routes.
Shoulder Work: Barker Rd.
🛠 When:
Tuesday, February 25 – Friday, February 28, 2025
📍 Location:
Barker Rd. between Bronco Way & Avenida de Mesilla
Details:
MetroNet will be placing underground wire utilities in the area.
Transit Impact: Roadrunner Transit routes and bus stops will not be affected.
City District: Council District 4.
Access to residences and businesses will be maintained throughout the project.
Safety Tips:
Follow all posted signs and drive with caution.
Shoulder Work: Tuscan Hills Ln.
🛠 When:
Wednesday, February 26, 2025 (One-day project)
📍 Location:
Tuscan Hills Ln. between Silver Sage Dr. & 2515 Tuscan Hills Ln. (eastbound traffic)
Details:
H & H Underground will be installing underground infrastructure for Comcast.
Transit Impact: Roadrunner Transit routes will not be affected.
City District: Council District 6.
Access to residents will be maintained during construction.
Safety Tips:
Follow all posted signs and drive with caution.
